HomeMy WebLinkAboutSOIL DENSITY 6 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms
20001
Stillwater Equity Partners
Hill & Sons Excavation
03/03/2020 N.Glore
11:00 AM 4:00 PM
10483
626 2276
6Top Lift 4.3
128
95%
Slab on Grade D:3
Top Lift
3/4" Base
96%
128
6.2
123.4
131.1
99%
128
4.9
126.4
132.6
3/4" Base
Top Lift
Slab on Grade C:3
96%
128
3.3
122.7
126.8
3/4" Base
Top Lift
Slab on Grade C.5:1
Digitally signed by Jacob P
Christensen
Date: 2020.03.20 08:50:19 -06'00'
6
6
6
1
122
126.7Slab on Grade D:1.5
3/4" Base
2
3
4