Loading...
HomeMy WebLinkAboutSOIL DENSITY 6 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms 20001 Stillwater Equity Partners Hill & Sons Excavation 03/03/2020 N.Glore 11:00 AM 4:00 PM 10483 626 2276 6Top Lift 4.3 128 95% Slab on Grade D:3 Top Lift 3/4" Base 96% 128 6.2 123.4 131.1 99% 128 4.9 126.4 132.6 3/4" Base Top Lift Slab on Grade C:3 96% 128 3.3 122.7 126.8 3/4" Base Top Lift Slab on Grade C.5:1 Digitally signed by Jacob P Christensen Date: 2020.03.20 08:50:19 -06'00' 6 6 6 1 122 126.7Slab on Grade D:1.5 3/4" Base 2 3 4