Loading...
HomeMy WebLinkAboutSOIL DENSITY 2 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms 20001 Stillwater Equity Partners Hill & Son construction 03/02/2020 N. Glore 2:00 PM 3:30 PM 10483 633 2272 6First Lift 6.1 128 98% Slab on Grade E:3.8 First lift 3/4" Base 95% 128 3.6 121 125.4 Digitally signed by Jacob P Christensen Date: 2020.03.03 09:20:26 -07'00' Had them add more water and waited for them to re-compact it 6 1 125 132.3Slab on Grade F:1 3/4" Base 2