Loading...
HomeMy WebLinkAboutSOIL DENSITY 13 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms Apts 20001 Still Water Equity Hill and Sons Excavation 02/24/2020 N.Gore 1:30pm 3:30pm 10483 633 2335 10First Lift 6.1 132 97% Slab on Grade B:1 First Lift Pit Run 98% 132 5.1 128.9 135.5 95% 132 5.7 124.8 131.8 Pit Run First Lift Slab on Grade D:2 Digitally signed by Jacob P Christensen Date: 2020.03.30 15:27:12 -06'00' 10 10 1 128 136.2Slab on Grade B:3.8 Pit Run 2 3