Loading...
HomeMy WebLinkAboutSOIL DENSITY 15 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill & Son Apr 24, 2020 D. Aust 10:30 AM 12:30 PM 000443 950 1601 8About 3' below top of foundation 4.8 132 95% Line C 0.0, 2.5 About 3' below top of foundation Pit Run 99% 132 4.7 130.7 136.2 99% 132 5.9 130.7 138.4 Pit Run About 3' below top of foundation Line B 0.5, 1.2 101% 132 5 133 139.6 Pit Run About 3' below top of foundation Line C 0.75, 1.1 98% 132 4.9 129.1 135.4 Pit Run About 3' below top of foundation Line D 0.0, 2.0 100% 132 6.3 131.4 139.8 Pit Run About 3' below top of foundation Line D 0.0, 3.0 98% 132 5.6 129.1 136.4 Pit Run About 3' below top of foundation Line D 0.5, 3.8 Digitally signed by Jacob P Christensen Date: 2020.04.29 12:34:59 -06'00' Cloudy and warm. Ambient temperature was 42 Degrees. 8 8 8 8 8 8 1 126 131.6Line B 0.5 ,3.8 Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 98% 132 5.8 129.5 137 Pit Run About 3' below top of foundation Line E 0.3, 3.5 132 97% 5.3 127.6 134.4 Pit Run About 3' below top of foundation Line F 0.0, 3.0 132 97% 6.3 127.6 135.7 Pit Run About 3' below top of foundation Line E 0.5, 2.5 132 95% 6.2 125.2 133 Pit Run About 3' below top of foundation Line E 0.8, 1.2 132 97% 6.3 128.5 136.7 Pit Run About 3' below top of foundation Line E 0.3, 1.0 8 8 8 8 8 8 11 9 10 12