HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00731 & 19-00736 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 05/04/2020 Partly cloudy 9:00 AM 55 4:00 PM Arrived on site and began observations. Observed the earthwork of building 11 and the concrete pour for the footings on the west side of building 6. I observed that the excavation was in general conformance with project plans. I also observed that the concrete placement was in general conformance with project plans. The reinforcement of the concrete was also in general conformance with project plans. 8129697 Excavation of building 11 Reinforcement of concrete Placement and consolidation of concrete J. Morrisson Page 2 of 2 Description: Description: Description: Description: Additional Comments: