HomeMy WebLinkAboutSOIL DENSITY 3 - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill and Son Excavation
05/12/2020 F Pelton
2:00 PM 5:25
867
1186 5177
121 ft below bottom of footing 5.33
132
98%
Approximately A.45 and 3.8 of Building 5.
1 ft below bottom of footing
Pit Run
98%
132
4.731
129.5
135.6
96%
132
4.231
126.7
132.1
Pit Run
1 ft below bottom of footing
Approximately A.55 and 3.8 of Building 5.
97%
132
4.705
128
134.1
Pit Run
1 ft below bottom of footing
Approximately B.5 and 2.5 of Building 5.
96%
132
4.811
127.3
133.5
Pit Run
1 ft below bottom of footing
Approximately C.5 and 3.8 of Building 5.
97%
132
5.241
127.6
134.3
Pit Run
1 ft below bottom of footing
Approximately E.8 and 3.8 of Building 5.
99%
132
5.676
131.3
138
Pit Run
1 ft below bottom of footing
Approximately E.8 and 2.5 of Building 5.
Digitally signed by Jacob P
Christensen
Date: 2020.05.13 10:19:33 -06'00'
12
12
12
12
12
12
1
130
137.2Approximately A.25 and 2.5 of Building 5.
Pit Run
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
95%
132
7.013
125.9
134.7
Pit Run
1 ft below bottom of footing
Approximately E.8 and 1.25 of Building 5.
132
98%
6.428
129.4
137.7
Pit Run
1 ft below bottom of footing
Approximately C.2 and 1.25 of Building 5.
132
95%
5.084
125.5
131.9
Pit Run
1 ft below bottom of footing
Approximately A.45 and 1.25 of Building 5.
132
95%
6.791
125.5
134
Pit Run
1 ft below bottom of footing
Approximately D.5 and 2.5 of Building 5.
132
95%
7.196
124.8
133.8
Pit Run
1 ft below bottom of footing
Approximately D.5 and 1.8 of Building 5.
12
12
12
12
12
8
11
9
10
12