Loading...
HomeMy WebLinkAboutSOIL DENSITY 3 - 19-00731 - The Grove at Thomson Farms - Hickory - 30 Unit Bldg 4In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill and Son Excavation 04/30/2020 F. Pelton 11:30 AM 3:30 76562 627 2783 10Bottom of Footing 7 132 95% Approximately 2.5 and 10 ft east of C of building 6. Bottom of Footing Pit Run 95% 132 6.9 125.1 133.8 95% 132 5.8 125.4 132.8 Pit Run Bottom of Footing Approximately 3.4 and center of C.5 and D of building 6. 97% 132 7 127.8 136.8 Pit Run Bottom of Footing Approximately 2.5 and 10 ft West of D of building 6. 98% 132 6.5 129.3 137.8 Pit Run Bottom of Footing Approximately 3 and center of E and F of building 6. 96% 132 6.4 126.8 135 Pit Run Bottom of Footing Approximately 2 and center of E and F of building 6. 95% 132 6.4 125.2 133.1 Pit Run Bottom of Footing Approximately 1.25 and center of D and E of building 6. Digitally signed by Jacob P Christensen Date: 2020.05.01 12:26:02 -06'00' 10 10 10 10 10 10 1 126 134.9Approximately 3.4 and center of A and B of building 6. Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 95% 132 7.3 125.2 134.3 Pit Run Bottom of Footing Approximately 1.25 and center of B and C of building 6. 108