Excavation PermitApplication
Public Works
35 North 1st Eastkeithd@rexburg.org Phone: 208.359.3020 x2320
Rexburg, ID 83440Fax: 208.359.3022
www.rexburg.org
Applicant/Contractor: ___________________________________________________________ Date: _______________________
Mailing Address: ______________________________________________ City: __________________ State: ______ Zip: ______
Phone #: _______________________Alt Phone #: _______________________ Email: ____________________________________
Excavation Address: __________________________________ Description: ____________________________________________
____________________________________________________________________________________________________________
Location of Excavation: Street Alley Sidewalk Undeveloped/Landscape Area
Purpose of Excavation: ______________________________________________________ Exc. Date: _______________________
Refund Recipient Name (if different from above): ________________________________ Phone #: ________________________
Refund Recipient Address: ______________________________________ City: __________________ State: ______ Zip: ______
CONDITIONS OF PERMIT:
1. No excavation within city right of way limits shall take place prior to the issuance of an excavation permit.
2. Property owners must be made aware of work happening adjacent to their parcels. An “Acceptance of Surface Repairs” form must be
signed by the property owner(s) prior to the excavation work being completed. (See Attachment A)
3. This permit expires 30 days after the issue date. Any work started and not completed within 30 days will be assessed a $100 weekly
inspection fee until work finalized.
4. The contractor is responsible for carrying a minimum of $500,000 general liability insurance coverage for possible damages during
excavation or other accidents.
5. The public right of way fee is $1,000 for any work that will disturb less than 30 square yards of asphalt surfacing. A $100 portion of this
fee will be retained by the city for initial inspection costs.
6. Excavation work which disturbs more than 30 square yards of asphalt surfacing must be individually assessed by the city for additional
fees.
7. All utilities must be placed a minimum of 4 feet below the finished grade unless specifically authorized otherwise in writing.
8. The contractor is responsible for contacting the city prior to placing backfill material and/or asphalt in city street locations. A city
representative will then assess and, if acceptable, the excavation fee less inspection costs will be refunded within 30 calendar days of
completion.
9. If permit conditions are not met the city will hold fees for 1 year from final asphalt placement. If repairs are required, the contractor will
be responsible for completing all repairs. If repairs are not made within 7 days, the city will complete repairs. The permit fee will be
retained and any additional costs will be the responsibility of the permit holder.
10. The contractor must notify Dig Line at 1-800-342-1585 at least two (2) business days in advance of the excavation date.
11. The contractor is responsible for furnishing and maintaining all barricades, signs, and flagmen as required by the Manual on Uniform
Traffic Control Devices (MUTCD).
12. Existing asphalt pavement shall be saw cut prior to placement of asphalt to provide a vertical surface.
13. Excavation and backfill work is to be completed in accordance with the requirements of Sections 300 and 800 of the Idaho Standards for
Public Works Construction (ISPWC). (See Attachment B.)
14. All excavated material, if acceptable for re-use shall be stockpiled or if not acceptable be immediately removed from the site. Excavated
material needs to be kept a safe distance from trenches or traveled roadways.
15. All street excavations must be backfilled with 3 feet of flowable fill, 4 inches of ¾ inch crushed aggregate road base, and 2 ½ inches
minimum thickness of plant mix pavement surface or equal to the existing material thickness, whichever is greater. No exceptions unless
pre-approved by city public works director.
16. Existing asphalt pavement shall be “tacked” prior to new asphalt placement.
17. Final repair of asphalt surfaces must be completed within 10 calendar days of the initial excavation.
stst
– March 31 except in the case of an emergency which must be approved by
18. No excavation permits will be approved from November 1
the city public works director. Winter excavation requires a temporary cold mix paving to be placed and maintained by the contractor
st
.
until the final paving is completed no later than May 1
In completing this application for an excavation permit, I hereby agree to all the above conditions as well as all applicable City of
Rexburg ordinances.
___________________________________________________________________
Applicant Signature Date
*Applicant will be notified of permit application approval and request for a deposit to be submitted before excavation can begin.
Revised 10/7/2019
(Attachment A)
Acceptance of Surface Repairs
On this ____ day of ____________________ 20___ I, __________________________, the parcel owner of the property located at
_______________________________ in Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
____________________________________________________________________________________________________________
Printed Property Owner Name Signature Date Contact Number
-------------------------------------------------------------------------------------------------------------------------
Acceptance of Surface Repairs
On this ____ day of ____________________ 20___ I, __________________________, the parcel owner of the property located at
_______________________________ in Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
____________________________________________________________________________________________________________
Printed Property Owner Name Signature Date Contact Number
-------------------------------------------------------------------------------------------------------------------------
Acceptance of Surface Repairs
On this ____ day of ____________________ 20___ I, __________________________, the parcel owner of the property located at
_______________________________ in Rexburg, Idaho, approve surface repairs to my property completed by the noted contractor.
____________________________________________________________________________________________________________
Printed Property Owner Name Signature Date Contact Number
Revised 10/7/2019
(Attachment B)
Backfill Material Requirements
3/4" crushed Road Base
3" Minus
(Type I)
3 in. 100
1 in. 100
3/4 in.90-100
3/8 in.
No. 425-6040-65
No. 8 30-50
No. 200 0-12 3-9
Backfill material shall meet the above gradation requirements and be placed in 12-inch maximum loose lifts and compacted
to 95% of maximum density in accordance with AASHTO T 99.
1/2-inch Class III Plant Mix Pavement shall be compacted to between 92% and 95% of maximum density in accordance with
mix design.
Asphalt surfacing must extend 1 foot beyond the trench sides in all directions or a minimum of 4 feet in width, whichever is
greater. Minimum asphalt thickness shall be 2 ½ inches or equal to the existing material thickness, whichever is greater
Final surface deviation must be within +/- ½” or less of surrounding surface conditions unless approved by the City of
Rexburg Engineer.
Damages caused by the excavation must also be repaired at contractors’ expense.
Excavation Permit Summary
Obtain Permit prior to starting excavation
Notify Dig-line at 1-800-342-1585
Provide Insurance
Backfilled with flowable fill
Notify city prior to backfilling, or loose refund
Compact all backfill- see attached specifications
Fill and compact the tip of trench with approved gravel
Notify city prior to paving, or loose refund
Paving surface to be completed within 10 days, or city will complete
Paving to be done according to attached specifications
Fix surface repair if it fails or the trench settles
Notify parcel owner
Return signed parcel owner acceptance form to the city