HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Headwaters 4/28/2020 Clear 2:30 PM 70 7:00 PM Arrived on site and began observations. The foundation walls of the west side of building 8, the footings of the east side of building 8, and the earthwork for building 9 were observed. Observed that the reinforcement of the concrete is in general conformance with plans. Observed that the placement of the concrete is in general conformance to plans. It was observed that the Excavation of building 9 was also in general conformance with plans. Digitally signed by Jacob P Christensen Date: 2020.04.29 12:43:16 -06'00'8129697 Placement of Concrete on Foundation walls bldg 8 Reinforcement of concrete in footings bldg 8 Excavation and compaction below footings in building 9 J. Morrison Page 2 of 2 Description: Description: Description: Description: Additional Comments: