Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 4/27/2020 Cloudy and wet 11:30 AM 51 2:30 PM Arrived on site and began observations. Location is Footings of building 8. I observed that the concrete reinforcement was in general conformance to plans. I observed that the placement of the concrete was in general conformance to plans. Digitally signed by Jacob P Christensen Date: 2020.04.29 12:40:04 -06'00'8129697 Reinforcement of Concrete Consolidation and placement of concrete Concrete placement and reinforcement J. Morrison Page 2 of 2 Description: Description: Description: Description: Additional Comments: