HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Concrete 4/27/2020
Cloudy and wet
11:30 AM
51
2:30 PM
Arrived on site and began observations. Location is Footings of building 8. I observed that the concrete
reinforcement was in general conformance to plans. I observed that the placement of the concrete was in
general conformance to plans.
Digitally signed by Jacob P Christensen
Date: 2020.04.29 12:40:04 -06'00'8129697
Reinforcement of Concrete Consolidation and placement of concrete Concrete placement and
reinforcement
J. Morrison
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: