HomeMy WebLinkAboutSOIL DENSITY 10 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farm Apartments 20001 Still Water Equity Hill & Sons Excavation 03/13/2020 B Ball 12:00 PM 3:00PM 443 973 1590 81st Lift 12" 6.7 124.9 98% Building 8 Footing backfill Line A0.6, 1.9 1st Lift 12" Pit Run 98% 124.9 6.4 122.1 129.9 99% 124.9 6.1 124 131.7 Pit Run 1st Lift 12" Building 8 Footing backfill Line A0.3, 1.4 100% 124.9 6 124.3 131.7 1st Lift 12" Building 8 Footing backfill Line A0.5, 1.8 100% 124.9 5.6 124.3 131.3 Pit Run 1st Lift 12" Building 8 Footing backfill Line A0.2, 1.3 100% 124.9 6.6 125.4 133.7 Pit Run 1st Lift 12" Building 8 Footing backfill Line A0.5, 1.8 97% 124.9 6.2 121.6 129.2 Pit Run 1st Lift 12" Building 8 Footing backfill Line A0.7, 1.3 Digitally signed by Jacob P Christensen Date: 2020.03.20 08:48:44 -06'00' When I arrived contractor had already completed compaction effort once. I tested three random locations and consistently hit between 92-93 percent of a 132.0 proctor. I observed as they applied more compaction effort. I tested again which resulted in an increase of density of <1.0 percent of proctor. I took a sample of the pit run material they had stockpiled on site to run a proctor on. The new proctor values are reported on this sheet. 8 8 8 8 8 8 1 122 130.6Building 8 Footing backfill Line A0.2, 1.7 Pit Run 5 6 7 2 3 4