Loading...
HomeMy WebLinkAboutSOIL DENSITY 8 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms Apts 20001 Still Water Equity Hill and Sons Excavation Apr 21, 2020 D. Aust 12:00 PM 2:30 PM 00043 973 1586 8Top of base under finish floor 3.3 128 95% Building 8 - Line D 0.5, 1.2 Top of base under finish floor 3/4" base from Parker Sand & Gravel 96% 128 3.9 122.4 127.2 98% 128 4.1 125.7 130.9 3/4" base from Parker Sand & Gravel Top of base under finish floor Building 8 - Line D 0.5, 3.6 95% 128 4 121.3 126.1 3/4" base from Parker Sand & Gravel Top of base under finish floor Building 8 - Line E 0.3, 3.6 96% 128 4.2 122.8 123 3/4" base from Parker Sand & Gravel Top of base under finish floor Building 8 - Line E 0.5, 2.0 95% 128 5 121.9 128 3/4" base from Parker Sand & Gravel Top of base under finish floor Building 8 - Line E 0.0, 1.4 95% 128 4.8 121.6 127.4 3/4" base from Parker Sand & Gravel Top of base under finish floor Building 8 - Line E 0.8, 1.2 Digitally signed by Jacob P Christensen Date: 2020.04.22 10:12:01 -06'00' Sunny, clear skies with ambient temperature of 65 degrees. 8 8 8 6 8 8 1 121 125Building 8 - Line E 0.7, 3.9 3/4" base from Parker Sand & Gravel 5 6 7 2 3 4