HomeMy WebLinkAboutSOIL DENSITY 5 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms
20001
Stillwater Equity Partners
Hill & Sons Const.
Apr 13, 2020 B Ball
9:00 AM 11:30 AM
76562
634 2254
82 Lift 4
132
99%
Building 8 Line D 0.3, 2.2
2 Lift
Parker Sand & Gravel Pit Run
100%
132
4.1
131.6
137
99%
132
4.4
130.3
136
Parker Sand & Gravel Pit Run
2 Lift
Building 8 Line E 0.3, 1.3
97%
132
4.8
128.2
133.2
Parker Sand & Gravel Pit Run
2 Lift
Building 8 Line E 0.8, 1.7
98%
132
4.5
129.3
135.1
Parker Sand & Gravel Pit Run
2 Lift
Building 8 Line E 0.6, 2.6
97%
132
4
128.5
133.7
Parker Sand & Gravel Pit Run
2 Lift
Building 8 Line E 0.2, 3.6
97%
132
4
128.5
133.7
Parker Sand & Gravel Pit Run
2 Lift
Building 8 Line E 0.7, 3.5
Digitally signed by Jacob P
Christensen
Date: 2020.04.14 11:05:06 -06'00'
Sunny, 26 degrees
8
8
8
8
8
8
1
131
136.1Building 8 Line D 0.6, 3.5
Parker Sand & Gravel Pit Run
5
6
7
2
3
4