Loading...
HomeMy WebLinkAboutSOIL DENSITY 4 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms 20001 Stillwater Equity Partners Hill & Sons Const. Apr 10, 2020 B Ball 9:30 AM 11.30 AM 76560 614 2609 81 Lift 5.9 132 98% Building 8 line B0.8, 2.2 1 Lift Edstrom Pit Run 97% 132 6.1 127.4 135.1 97% 132 5.5 128.5 135.6 Edstrom Pit Run 1 Lift Building 8 line B0.3, 1.0 98% 132 5.9 129.3 136.9 Edstrom Pit Run 3 Lift Building 8 line A08, 1.4 98% 132 6.6 130 138.5 Edstrom Pit Run 3 Lift Building 8 line A0.4, 2.3 98% 132 6.8 128.8 137.6 Edstrom Pit Run 3 Lift Building 8 line A0.8, 3.6 Digitally signed by Jacob P Christensen Date: 2020.04.14 11:09:41 -06'00' Clear, 58 degrees 8 8 8 8 8 1 129 136.2Building 8 line B0.7, 3.4 Edstrom Pit Run 5 6 2 3 4