HomeMy WebLinkAboutSOIL DENSITY 14 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms Apts
20001
Still Water Equity
Hill and Sons Excavation
05-11-2020 F Pelton
1:30,5:00 3:30,7:00
867
5137 1182
10Bottom of Finish grade 3.65
132
97%
Approximately E.25 and 1.25 of building 8.
Bottom of Finish grade
Pit Run
98%
132
3.69
129.3
134.1
95%
132
2.67
125.1
128.4
Pit Run
Bottom of Finish grade
Approximately E.75 and 2.6 of building 8.
96%
132
3.208
126.5
130.5
Pit Run
Bottom of Finish grade
Approximately E.75 and 3.7 of building 8.
95%
132
3.083
125
128.8
Pit Run
Bottom of Finish grade
Approximately E.25 and 3.75 of building 8.
Digitally signed by Jacob P
Christensen
Date: 2020.05.13 10:17:34 -06'00'
I tried doing 12 inch depths, but the holes kept filling in and that is why I did a 10 inch depth.
10
10
10
10
1
128
132.6Approximately E.75 and 1.25 of building 8.
Pit Run
5
2
3
4