Loading...
HomeMy WebLinkAboutSOIL DENSITY 14 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms Apts 20001 Still Water Equity Hill and Sons Excavation 05-11-2020 F Pelton 1:30,5:00 3:30,7:00 867 5137 1182 10Bottom of Finish grade 3.65 132 97% Approximately E.25 and 1.25 of building 8. Bottom of Finish grade Pit Run 98% 132 3.69 129.3 134.1 95% 132 2.67 125.1 128.4 Pit Run Bottom of Finish grade Approximately E.75 and 2.6 of building 8. 96% 132 3.208 126.5 130.5 Pit Run Bottom of Finish grade Approximately E.75 and 3.7 of building 8. 95% 132 3.083 125 128.8 Pit Run Bottom of Finish grade Approximately E.25 and 3.75 of building 8. Digitally signed by Jacob P Christensen Date: 2020.05.13 10:17:34 -06'00' I tried doing 12 inch depths, but the holes kept filling in and that is why I did a 10 inch depth. 10 10 10 10 1 128 132.6Approximately E.75 and 1.25 of building 8. Pit Run 5 2 3 4