Loading...
HomeMy WebLinkAboutSOIL DENSITY 12 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms 20001 Stillwater Equity Partners Hill & Sons Const. 03/20/2020 N. Glore 2:00PM 3:00PM 10483 634 2254 102 Lift 7.2 125 100% Building 8 Footings: 3,A 2 Lift Pit Run 98% 124.9 8.3 122.1 132.2 100% 124.9 7 124.8 133.5 Pit Run 2 Lift Building 8 Footings: 3,F 99% 124.9 4.8 123.6 129.5 Pit Run 2 Lift Building 8 Footings: 2.5,B Digitally signed by Jacob P Christensen Date: 2020.04.14 11:08:28 -06'00' 10 10 10 1 125 133.9Building 8 Footings: 3,C.5 Pit Run 2 3 4