HomeMy WebLinkAboutSOIL DENSITY 12 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms
20001
Stillwater Equity Partners
Hill & Sons Const.
03/20/2020 N. Glore
2:00PM 3:00PM
10483
634 2254
102 Lift 7.2
125
100%
Building 8 Footings: 3,A
2 Lift
Pit Run
98%
124.9
8.3
122.1
132.2
100%
124.9
7
124.8
133.5
Pit Run
2 Lift
Building 8 Footings: 3,F
99%
124.9
4.8
123.6
129.5
Pit Run
2 Lift
Building 8 Footings: 2.5,B
Digitally signed by Jacob P
Christensen
Date: 2020.04.14 11:08:28 -06'00'
10
10
10
1
125
133.9Building 8 Footings: 3,C.5
Pit Run
2
3
4