HomeMy WebLinkAboutSOIL DENSITY 3 - 19-00736 - The Grove at Thomson Farms - Linden - 30 Unit Bldg 7In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill and Son Excavation
05-04-2020 F Pelton
9:00,1:30 12:00, 4:00
76562
672 2801
101 ft below bottom of footing 6.1
132
95%
Approximately 1.8 and E.5 of Building 11.
1 ft below bottom of footing
Pit Run
95%
132
7
125.1
133.9
97%
132
4.6
128.5
134.4
Pit Run
1 ft below bottom of footing
Approximately 1.2 and D.5 of Building 11.
97%
132
3.7
127.6
132.3
Pit Run
1 ft below bottom of footing
Approximately 1.2 and B.5 of Building 11.
98%
132
3.9
129.4
134.5
Pit Run
1 ft below bottom of footing
Approximately 2.5 and D.5 of Building 11.
96%
132
6.1
127.1
134.9
Pit Run
1 ft below bottom of footing
Approximately 3.6 and A.25 of Building 11.
97%
132
4.5
127.7
133.4
Pit Run
1 ft below bottom of footing
Approximately 3.4 and B.5 of Building 11.
Digitally signed by Jacob P
Christensen
Date: 2020.05.08 11:22:57 -06'00'
10
10
8
10
10
10
1
125
133Approximately 3.4 and E.5 of Building 11.
Pit Run
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
97%
132
5.2
128.3
135
Pit Run
1 ft below bottom of footing
Approximately 3.9 and C.5 of Building 11.
132
95%
6.4
125.4
133.4
Pit Run
1 ft below bottom of footing
Approximately 3.9 and C.5 of Building 11.
132
95%
5.3
125.4
132.4
Pit Run
1 ft below bottom of footing
Approximately 3.9 and C.5 of Building 11.
132
95%
5.3
125.8
132.5
Pit Run
1 ft below bottom of footing
Approximately 2.5 and A.25 of Building 11.
10
10
10
10
8
11
9
10