Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Headwaters Construction 4/14/2020 Overcast 12:30 PM 45 4:00 PM I arrived on site and began my observation of the placement of the HDU numbers 5,8,10,11 and 14 in building 9. I observed that the contractor had drilled each hole to the appropriate depth and that each hole was clean and free from dust and debris. I observed the contractor use Hilti 500 epoxy in each of the holes. I observed that there was sufficient epoxy in each hole. I observed the contractor place the appropriate anchor in each hole. I observed this was completed in general conformance to project documents. Digitally signed by Jacob P Christensen Date: 2020.04.15 10:23:11 -06'00'8129697 E. Jenkins Page 2 of 2 Description: Description: Description: Description: Additional Comments: