HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Headwaters Construction 4/14/2020
Overcast
12:30 PM
45
4:00 PM
I arrived on site and began my observation of the placement of the HDU numbers 5,8,10,11 and 14 in
building 9. I observed that the contractor had drilled each hole to the appropriate depth and that each hole
was clean and free from dust and debris. I observed the contractor use Hilti 500 epoxy in each of the holes.
I observed that there was sufficient epoxy in each hole. I observed the contractor place the appropriate
anchor in each hole. I observed this was completed in general conformance to project documents.
Digitally signed by Jacob P Christensen
Date: 2020.04.15 10:23:11 -06'00'8129697
E. Jenkins
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: