Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 06/26/2020 sunny 5:45AM 52 9:30AM I observed the concrete placement of the east second and third floors, and stair ways of building 9. I observed that the concrete had microfibers within the mix. I observed that the concrete placement was in general conformance with project documents. I observed the duration of the pour. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.29 09:22:02 -06'00'8129697 Concrete placement F. Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: