HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Construction 06/26/2020
sunny
5:45AM
52
9:30AM
I observed the concrete placement of the east second and third floors, and stair ways of building 9. I
observed that the concrete had microfibers within the mix. I observed that the concrete placement was in
general conformance with project documents. I observed the duration of the pour.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.29 09:22:02
-06'00'8129697
Concrete placement
F. Pelton
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: