Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Superior Steel Solutions 4/20/2020 Sunny 1:00 PM 60 3:30 PM I arrived on site and began my observations of the stairwell towers in Building 9. I observed that the contractor had placed the stair pans and landings and had welded them in place. I observed that the welds appeared sound with adequate penetration. No surface defects were observed. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.04.22 14:15:20 -06'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: