Loading...
HomeMy WebLinkAboutCONCRETE TEST 1 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength The Grove Still Water Equity Partnership 292 F 20001 14892 11 of 22 yards MP 322 F. Pelton 06-19-2020, 6:30 AM 8.5 1.75 66 41 2 144A 144E 144C 144B 144D 4 06/26/20 07/17/20 07/17/20 07/17/20 07/17/20 54,140 2 4,5004,30712.57 Walters Ready Mix Building 9 west stair way 7 28 28 28 H The first truck did not contain fibers, but the second truck did have fibers in the concrete. S. Edwards 06/20/2020