HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Concrete 05/01/2020
Cloudy
2:00 PM
64
5:00 PM
Arrived on site and began observations. Observed the concrete pour between gridlines C and D of building
7. I observed that the concrete reinforcement was in general conformance with project plans. I also
observed that the placement of the concrete was in general conformance with project plans.
Digitally signed by Jacob P Christensen
Date: 2020.05.08 11:28:32 -06'00'8129697
Reinforcement of concrete Placement of concrete Placement and consolidation of
concrete
J. Morrisson
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: