HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Headwaters 4/30/2020
Cloudy
11:30 AM
53.2
3:00 PM
Arrived on site and began observations. Observed the concrete pour for the foundation walls on the east
side of building 7 and the footings for the center of building 7. I observed that the concrete placement was
in general conformance with project plans. I also observed that the concrete reinforcement was in general
conformance with project plans.
Digitally signed by Jacob P Christensen
Date: 2020.05.01 12:36:40 -06'00'8129697
Reinforcement of Concrete Placement and consolidation of concrete
J. Morrison
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: