Loading...
HomeMy WebLinkAboutSOIL DENSITY 8 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill and Son Excavation 05/07/2020 F. Pelton 3:00 PM 6:00 PM 3491 726 2847 12Bottom of finish grade 3.6 132 98% Approximately C.25 and 2.5 of building 7. Bottom of finish grade Pit Run 100% 132 5 132.1 138.7 98% 132 4.1 129.9 131.1 Pit Run Bottom of finish grade Approximately C.1 and 1.3 of building 7. 95% 132 4.5 126 132.2 Pit Run Bottom of finish grade Approximately C.75 and 1.5 of building 7. 98% 132 4.3 129.4 134.9 Pit Run Bottom of finish grade Approximately C.85 and 2.5 of building 7. 95% 132 3.7 126 130.7 Pit Run Bottom of finish grade Approximately C.75 and 3.75 of building 7. 96% 132 3.7 126.7 131.4 Pit Run Bottom of finish grade Approximately D.5 and 3.75 of building 7. Digitally signed by Jacob P Christensen Date: 2020.05.08 11:26:43 -06'00' 12 12 12 12 12 12 1 130 134.1Approximately C.1 and 3.8 of building 7. Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 97% 132 3.5 128.4 132.9 Pit Run Bottom of finish grade Approximately D.25 and 2.5 of building 7. 132 96% 3.8 126.4 131.2 Pit Run Bottom of finish grade Approximately D.75 and 2.5 of building 7. 132 95% 3.1 124.9 128.9 Pit Run Bottom of finish grade Approximately D.5 and 1.5 of building 7. 132 99% 3.154 131 138 Pit Run One ft below finished grade Approximately E.25 and 1.5 of building 7. 132 99% 5.6 130.2 137.5 Pit Run One ft below finished grade Approximately E.75 and 1.5 of building 7. 132 98% 5.2 128.9 135.6 Pit Run One ft below finished grade Approximately E.5 and 2.5 of building 7. 132 99% 5.9 130.5 138.2 Pit Run One ft below finished grade Approximately E.25 and 3.75 of building 7. 132 98% 5.7 129.8 137.2 Pit Run One ft below finished grade Approximately E.75 and 3.75 of building 7. 12 12 12 12 12 12 12 12 8 11 15 9 10 14 13 12