HomeMy WebLinkAboutCONCRETE TEST 3 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name:
Client:
Mix Number:
Project Number:
Ticket Number:
Load Amount:
Admixtures:
Tested By:
Date and Time:
Compressive Strength of Concrete Test Specimens
Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511)
Slump (Inches):
Entrained Air (%):
Concrete Temperature:
Ambient Temperature:
Test Results:Minimum:Maximum:
Cylinder #
Lab Test Data: (ASTM C39, C42, C617, and C1231)
Break Age
Cylinder
Diameter (in)
Area
(in² )
Break
Date
Maximum Load
(lbs)
Break
Type
Compressive
Strength (psi)Required 28 day
Strength (psi)
°F
°F
Reviewed By:
Supplier:
Test Location:
Unit Weight (PCF):Set # :
Cylinders Picked Up By: Date and Time:
Hi / Low Temperatures
Remarks:
28-day Average Strength
Thomson Farms
Still Water Equity Partnership
142
20001
13474
10 of 29 yards
MP 322, MA AE 90
Forrest Pelton
5/1/2020 3:15 PM
7
6
65.6
63
5
6
63A
63E
63C
63B
63D
4 05/08/20
05/29/20
05/29/20
05/29/20
58,160 2 4,0004,62612.57
Walter's Ready Mix
Between gridlines 3.8 and 3 on line D. Building 7
7
28
28
28
H
Super plasticizer added to increase slump
1 of 1ds
B. Ball 05/04/2020