Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00024 - 33 Winn Dr - Tenant FinishPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/29/2020 10:15 am Permit Details Permit Number: 10-00024 33 Winn Dr - Tenant Finish 33 Winn Dr Commercial Tenant Finish Permit Issued Date: 12/08/2014 Permit Inspection Statistics 11Total Inspections Completed: 9Total Inspections Passed: Inspection Pass Rate: 81.82% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 02/26/2010PassPLL ADMINCommercial Framing/Structure Inspection As per Jon Berry. Bearing walls in basement need anchor bolts. OK to insulate exterior and walls without anchor bolts. Inspector Comments: 03/05/2010PassPLL ADMINCommercial Insulation Inspection As per Jon Berry. Anchor bolts OK. Insulation OK to cover.Inspector Comments: 05/18/2010PassPLL ADMINCommercial Building Final As per Jon Berry. Building final completed.Inspector Comments: Electrical 02/23/2010PassBret StoddardCommercial Electrical Rough-in Approved for cover- upstairs and partial downstairs.Inspector Comments: 05/18/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection GFCI protection required in lad, sterilization room. Single rec required in break room. Charge breaker to 15A for listed sterile equipment and GFCI. Inspector Comments: 05/20/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.Inspector Comments: Mechanical 03/15/2010PassPLL ADMINHVAC Rough-in As per Jon Berry. HVAC Rough looks good. Fan installed in med gas room. 32#- tested good. Inspector Comments: 05/18/2010PassPLL ADMINHVAC Final Inspection As per Jon Berry. HVAC final completed.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00024 33 Winn Dr - Tenant Finish 33 Winn Dr Commercial Tenant Finish Permit Status of (Open) as of Report Date: 06/29/2020 10:15 am Permit Inspection Summary Plumbing 03/02/2010PassPLL ADMINPlumbing Rough-in Approved per Bradley JohnsonInspector Comments: 05/18/2010FailPLL ADMINPlumbing Final Inspection As per Bradley Johnson. Install backflow device for plaster grinder. Test backflow devices. Install fire extinguishers. Chain bottles (gas) top third and bottom third. Inspector Comments: 07/29/2010PassPLL ADMINPlumbing Final Inspection Approved per Brad JohnsonInspector Comments: Page 2 of 2