Permit Status of (Open) as of Report Date: 06/29/2020 10:15 am
Permit Details Permit Number: 10-00024
33 Winn Dr - Tenant Finish
33 Winn Dr
Commercial Tenant Finish
Permit Issued Date: 12/08/2014
Permit Inspection Statistics
11Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 81.82%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
02/26/2010PassPLL ADMINCommercial Framing/Structure Inspection
As per Jon Berry. Bearing walls in basement need anchor bolts. OK to insulate
exterior and walls without anchor bolts.
Inspector Comments:
03/05/2010PassPLL ADMINCommercial Insulation Inspection
As per Jon Berry. Anchor bolts OK. Insulation OK to cover.Inspector Comments:
05/18/2010PassPLL ADMINCommercial Building Final
As per Jon Berry. Building final completed.Inspector Comments:
Electrical
02/23/2010PassBret StoddardCommercial Electrical Rough-in
Approved for cover- upstairs and partial downstairs.Inspector Comments:
05/18/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
GFCI protection required in lad, sterilization room.
Single rec required in break room.
Charge breaker to 15A for listed sterile equipment and GFCI.
Inspector Comments:
05/20/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.Inspector Comments:
Mechanical
03/15/2010PassPLL ADMINHVAC Rough-in
As per Jon Berry. HVAC Rough looks good. Fan installed in med gas room.
32#- tested good.
Inspector Comments:
05/18/2010PassPLL ADMINHVAC Final Inspection
As per Jon Berry. HVAC final completed.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00024
33 Winn Dr - Tenant Finish
33 Winn Dr
Commercial Tenant Finish
Permit Status of (Open) as of Report Date: 06/29/2020 10:15 am
Permit
Inspection
Summary
Plumbing
03/02/2010PassPLL ADMINPlumbing Rough-in
Approved per Bradley JohnsonInspector Comments:
05/18/2010FailPLL ADMINPlumbing Final Inspection
As per Bradley Johnson.
Install backflow device for plaster grinder.
Test backflow devices.
Install fire extinguishers.
Chain bottles (gas) top third and bottom third.
Inspector Comments:
07/29/2010PassPLL ADMINPlumbing Final Inspection
Approved per Brad JohnsonInspector Comments: