HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00049 - 566 E 5th S - Canyon View Estates - New SFRPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/29/2020 9:42 am
Permit Details Permit Number: 10-00049
566 E 5th S - Canyon View Estates - New SFR
566 E 5th S
New Single Family Residence
Permit Issued Date: 12/10/2014
Permit Inspection Statistics
19Total Inspections Completed:
14Total Inspections Passed:
Inspection Pass Rate: 73.68%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
02/26/2010PassTed DyeCommercial Footing Inspection
Ufer on east wall.Inspector Comments:
03/01/2010PassTed DyeFoundation Inspection
04/27/2010PassPLL ADMINSheeting
4/12/10 - Roof sheeting approved
4/27/10 - Framing, sheathing and hold downs look good.
Inspector Comments:
05/03/2010FailTed DyeResidential Insulation Inspection
Hole through top plate is not sealed. Fire blocking needed between studs at
furdowns. Insulate wall separating attic from great room.
Inspector Comments:
05/05/2010FailTed DyeResidential Framing/Structure Inspection
Diagonal nails on HRI truss bracket are missing.
Add studs under girder truss "B-2" as required. (2)
Add stud under girder KI on south side.
Fire blocking needed on furdowns master bedroom.
Inspector Comments:
05/07/2010PassTed DyeResidential Framing/Structure Inspection
05/10/2010PassTed DyeResidential Insulation Inspection
Determined that furdowns would be full of insulation there by they would not
require fireblocking.
Inspector Comments:
05/10/2010PassTed DyeResidential Sheetrock/Drywall Inspection
08/27/2010FailTed DyeResidential Building Final
Ladder in one window well.Inspector Comments:
09/03/2010PassTed DyeResidential Building Final
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00049
566 E 5th S - Canyon View Estates - New SFR
566 E 5th S
New Single Family Residence
Permit Status of (Open) as of Report Date: 06/29/2020 9:42 am
Permit
Inspection
Summary
Electrical
04/08/2010PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power.Inspector Comments:
04/29/2010PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover main level.Inspector Comments:
08/24/2010PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O.
unfinished basement entirely.
Inspector Comments:
Mechanical
05/03/2010FailPLL ADMINHVAC Rough-in
As per Jon Berry.
1" clearance required around fireplace vent and insulation. Extend gas line to
meter base.
*Approved in HVAC Final*
Inspector Comments:
08/27/2010FailQuinton OwensHVAC Final Inspection
Dryer vent is covered p at exterior. Connector requires where vents join from
water heaters.
Inspector Comments:
08/31/2010PassPLL ADMINHVAC Final Inspection
As per Jon Berry.
HVAC Final completed.
Inspector Comments:
Plumbing
03/09/2010PassDon AllenPlumbing Underground Inspection
04/20/2010PassPLL ADMINPlumbing Rough-in
Approved!! Per Bradley JohnsonInspector Comments:
08/23/2010PassPLL ADMINPlumbing Final Inspection
As per Bradley Johnson.Inspector Comments:
Page 2 of 2