HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00086 - Madison Jr High School - RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/29/2020 9:09 am
Permit Details Permit Number: 10-00086
Madison Jr High School - Remodel
134 Madison Ave
Commercial - Remodel
Permit Issued Date:
Permit Inspection Statistics
17Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate: 88.24%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
01/04/2011PassQuinton OwensCommercial Framing/Structure Inspection
Framing at West End OKInspector Comments:
01/25/2011PassJohn BerryCommercial Framing/Structure Inspection
Area D Framing Looks Good, Area E Framing Looks GoodInspector Comments:
02/03/2011PassJohn BerryCommercial Framing/Structure Inspection
Upstairs framing & Several small areas downstairs look goodInspector Comments:
07/15/2011N/AJohn BerryCommercial Building Final
-cafateria S. Exit Sign, hand rail returns, fe - science rooms w/gas, access
r/roomsigns - paper towel holder 48" max above fin floor to opening, exit sign se
halls, hookup kit appl, horn stroke, bobcat area, emer lights, emer exit lights,
welding, no self test emer lights, locker room emer lights, and main gym.
Inspector Comments:
08/23/2011PassJohn BerryCommercial Building Final
Over lr upstairs, wood shop light, 2 - halls light, FE-lab and E Light, SW restroom
E lights, RM 288b, 282 Emu Lights, Corale Room, 2 Exit Lights
Completed
Inspector Comments:
10/14/2011PassJohn BerryCommercial Footing Inspection
Footings & Rebar ok to pourInspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00086
Madison Jr High School - Remodel
134 Madison Ave
Commercial - Remodel
Permit Status of (Open) as of Report Date: 06/29/2020 9:09 am
Permit
Inspection
Summary
Electrical
01/04/2011PassBret StoddardCommercial Electrical Rough-in
Approved for coverin walls - Area CInspector Comments:
01/25/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover in areas listed below
Area D - Library - Area E Classrooms
Inspector Comments:
02/07/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover area B(upper)Inspector Comments:
05/11/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover - ceilings - area C, Area E, Library(area D), Area G Corridors
only, and upper areas above locker rooms ( Area b).
Inspector Comments:
05/24/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover - ceilings- corridors throughout (E,D,B,F,G)Inspector Comments:
07/08/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Need Covers and loose ends tied up Area CInspector Comments:
Mechanical
01/24/2011PassJohn BerryHVAC Rough-in
Ducting in Locker Rooms OK Installed ducting in other areas looks goodInspector Comments:
03/24/2011PassJohn BerryHVAC Rough-in
Rough Looks GoodInspector Comments:
06/23/2011PassJohn BerryHVAC Final Inspection
HVAC Final CompleteInspector Comments:
Plumbing
11/01/2010PassBrad JohnsonPlumbing Rough-in
Tested and approved for coverInspector Comments:
06/23/2011PassPLL ADMINPlumbing Final Inspection
Signed by J. M. Waltz, Notes - "No Discrepancies noted"Inspector Comments:
Page 2 of 2