Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00086 - Madison Jr High School - RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/29/2020 9:09 am Permit Details Permit Number: 10-00086 Madison Jr High School - Remodel 134 Madison Ave Commercial - Remodel Permit Issued Date: Permit Inspection Statistics 17Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 88.24% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 01/04/2011PassQuinton OwensCommercial Framing/Structure Inspection Framing at West End OKInspector Comments: 01/25/2011PassJohn BerryCommercial Framing/Structure Inspection Area D Framing Looks Good, Area E Framing Looks GoodInspector Comments: 02/03/2011PassJohn BerryCommercial Framing/Structure Inspection Upstairs framing & Several small areas downstairs look goodInspector Comments: 07/15/2011N/AJohn BerryCommercial Building Final -cafateria S. Exit Sign, hand rail returns, fe - science rooms w/gas, access r/roomsigns - paper towel holder 48" max above fin floor to opening, exit sign se halls, hookup kit appl, horn stroke, bobcat area, emer lights, emer exit lights, welding, no self test emer lights, locker room emer lights, and main gym. Inspector Comments: 08/23/2011PassJohn BerryCommercial Building Final Over lr upstairs, wood shop light, 2 - halls light, FE-lab and E Light, SW restroom E lights, RM 288b, 282 Emu Lights, Corale Room, 2 Exit Lights Completed Inspector Comments: 10/14/2011PassJohn BerryCommercial Footing Inspection Footings & Rebar ok to pourInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00086 Madison Jr High School - Remodel 134 Madison Ave Commercial - Remodel Permit Status of (Open) as of Report Date: 06/29/2020 9:09 am Permit Inspection Summary Electrical 01/04/2011PassBret StoddardCommercial Electrical Rough-in Approved for coverin walls - Area CInspector Comments: 01/25/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover in areas listed below Area D - Library - Area E Classrooms Inspector Comments: 02/07/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover area B(upper)Inspector Comments: 05/11/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover - ceilings - area C, Area E, Library(area D), Area G Corridors only, and upper areas above locker rooms ( Area b). Inspector Comments: 05/24/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover - ceilings- corridors throughout (E,D,B,F,G)Inspector Comments: 07/08/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Need Covers and loose ends tied up Area CInspector Comments: Mechanical 01/24/2011PassJohn BerryHVAC Rough-in Ducting in Locker Rooms OK Installed ducting in other areas looks goodInspector Comments: 03/24/2011PassJohn BerryHVAC Rough-in Rough Looks GoodInspector Comments: 06/23/2011PassJohn BerryHVAC Final Inspection HVAC Final CompleteInspector Comments: Plumbing 11/01/2010PassBrad JohnsonPlumbing Rough-in Tested and approved for coverInspector Comments: 06/23/2011PassPLL ADMINPlumbing Final Inspection Signed by J. M. Waltz, Notes - "No Discrepancies noted"Inspector Comments: Page 2 of 2