HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00088 - Schneider Airport HangerPermit
Inspection
Summary
Permit Status of (Expired) as of Report Date: 06/29/2020 9:02 am
Permit Details Permit Number: 10-00088
Schneider Airport Hanger
471 Chuck Yeager Way
New Commercial Building
Permit Issued Date: 05/08/2014
Permit Inspection Statistics
17Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate: 88.24%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
03/17/2010PassPLL ADMINFooting Inspection
As per Jon Berry.Inspector Comments:
03/19/2010PassPLL ADMINFoundation Inspection
As per Jon Berry.Inspector Comments:
04/22/2010FailPLL ADMINFraming/Structure Inspection
Bracing/blocking missing gable ends
Diagonal bracing missing
Hold down straps missing 4 ea
Door NW corner must be 2 hr rated
Need to see truss details
As per Jon Berry.
Inspector Comments:
06/04/2010PassPLL ADMINFraming/Structure Inspection
PCW
As per Jon Berry.
Inspector Comments:
06/04/2010PassPLL ADMINInsulation Inspection
NA
As per Jon Berry.
Inspector Comments:
08/03/2010PassPLL ADMINSheetrock/Drywall Inspection
Exterior N&S walls doubled inside and out
as per Jon Berry.
Inspector Comments:
08/03/2010PassPLL ADMINSidewalk Inspection
as per Jon Berry.Inspector Comments:
08/03/2010PassPLL ADMINBuilding Final
as per Jon Berry.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00088
Schneider Airport Hanger
471 Chuck Yeager Way
New Commercial Building
Permit Status of (Expired) as of Report Date: 06/29/2020 9:02 am
Permit
Inspection
Summary
Electrical
05/04/2010PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power after they install the proper
clamp for the rebar connection-also must have access to the reversible clamp-will
re-inspect this on the final.
Inspector Comments:
05/04/2010PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the hangar-office area is unclassified location/has
ventilation in it also-wired with MC but the receptacles are lower than throughout
the rest of the building-Need to confirm with Kerry how many air crafts are to
stay in this building and type/size to make sure that there are no classified
locations needed to be wired accordingly-Confirmed with Natalie that only one
aircraft is going in this hangar and it is a very small aircraft-a long way away
from the walls and ceiling.
Inspector Comments:
08/03/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and a C.O. The ele. cont. changed the things that needed to
be done while I was there.
Inspector Comments:
Fire
08/03/2010PassPLL ADMINFire Department Final Inspection
as per Brad Johnson.Inspector Comments:
Mechanical
06/04/2010PassPLL ADMINHVAC Rough-in
as per Jon Berry.Inspector Comments:
08/03/2010PassPLL ADMINHVAC Final Inspection
as per Jon Berry.Inspector Comments:
Plumbing
05/04/2010PassPLL ADMINPlumbing Underground Inspection
As per Brad Johnson.Inspector Comments:
08/03/2010PassPLL ADMINPlumbing Rough-in
As per Brad Johnson.Inspector Comments:
08/03/2010FailPLL ADMINPlumbing Final Inspection
No plumbing services are provided for the building.
As per Brad Johnson.
Inspector Comments:
Inspections Required
Plumbing Final Inspection
Page 2 of 2