Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00088 - Schneider Airport HangerPermit Inspection Summary Permit Status of (Expired) as of Report Date: 06/29/2020 9:02 am Permit Details Permit Number: 10-00088 Schneider Airport Hanger 471 Chuck Yeager Way New Commercial Building Permit Issued Date: 05/08/2014 Permit Inspection Statistics 17Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 88.24% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 03/17/2010PassPLL ADMINFooting Inspection As per Jon Berry.Inspector Comments: 03/19/2010PassPLL ADMINFoundation Inspection As per Jon Berry.Inspector Comments: 04/22/2010FailPLL ADMINFraming/Structure Inspection Bracing/blocking missing gable ends Diagonal bracing missing Hold down straps missing 4 ea Door NW corner must be 2 hr rated Need to see truss details As per Jon Berry. Inspector Comments: 06/04/2010PassPLL ADMINFraming/Structure Inspection PCW As per Jon Berry. Inspector Comments: 06/04/2010PassPLL ADMINInsulation Inspection NA As per Jon Berry. Inspector Comments: 08/03/2010PassPLL ADMINSheetrock/Drywall Inspection Exterior N&S walls doubled inside and out as per Jon Berry. Inspector Comments: 08/03/2010PassPLL ADMINSidewalk Inspection as per Jon Berry.Inspector Comments: 08/03/2010PassPLL ADMINBuilding Final as per Jon Berry.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00088 Schneider Airport Hanger 471 Chuck Yeager Way New Commercial Building Permit Status of (Expired) as of Report Date: 06/29/2020 9:02 am Permit Inspection Summary Electrical 05/04/2010PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power after they install the proper clamp for the rebar connection-also must have access to the reversible clamp-will re-inspect this on the final. Inspector Comments: 05/04/2010PassBret StoddardCommercial Electrical Rough-in Approved for cover in the hangar-office area is unclassified location/has ventilation in it also-wired with MC but the receptacles are lower than throughout the rest of the building-Need to confirm with Kerry how many air crafts are to stay in this building and type/size to make sure that there are no classified locations needed to be wired accordingly-Confirmed with Natalie that only one aircraft is going in this hangar and it is a very small aircraft-a long way away from the walls and ceiling. Inspector Comments: 08/03/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and a C.O. The ele. cont. changed the things that needed to be done while I was there. Inspector Comments: Fire 08/03/2010PassPLL ADMINFire Department Final Inspection as per Brad Johnson.Inspector Comments: Mechanical 06/04/2010PassPLL ADMINHVAC Rough-in as per Jon Berry.Inspector Comments: 08/03/2010PassPLL ADMINHVAC Final Inspection as per Jon Berry.Inspector Comments: Plumbing 05/04/2010PassPLL ADMINPlumbing Underground Inspection As per Brad Johnson.Inspector Comments: 08/03/2010PassPLL ADMINPlumbing Rough-in As per Brad Johnson.Inspector Comments: 08/03/2010FailPLL ADMINPlumbing Final Inspection No plumbing services are provided for the building. As per Brad Johnson. Inspector Comments: Inspections Required Plumbing Final Inspection Page 2 of 2