Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00095 - Merrell Dental OfficePermit Inspection Summary Permit Status of (Open) as of Report Date: 06/29/2020 8:58 am Permit Details Permit Number: 10-00095 Merrell Dental Office 1183 Summers Dr New Commercial Building Permit Issued Date: Permit Inspection Statistics 19Total Inspections Completed: 12Total Inspections Passed: Inspection Pass Rate: 63.16% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 05/17/2010PassJohn BerrySidewalk Inspection Maintain 11/2 B of sidewalk to bldg EavesInspector Comments: 06/10/2010PassJohn BerryCommercial Footing Inspection Layout looks good Footing & rebar looks good Inspector Comments: 06/22/2010PassJohn BerryFoundation Inspection Foundation & rebar looks good.Inspector Comments: 09/20/2010PassJohn BerryCommercial Framing/Structure Inspection -Anchor bolts needed in bearing walls in basement -grinder trusses need more studs at bearing points Inspector Comments: 09/20/2010N/AJohn BerryCommercial Framing/Structure Inspection Not readyInspector Comments: 09/21/2010PassJohn BerryCommercial Insulation Inspection Insulation in west end of building ok to cover after allowing to dry note: East ext. walls are not insulated. Inspector Comments: 09/24/2010PassTed DyeResidential Sheetrock/Drywall Inspection All type x fire code rock nail patterns look good.Inspector Comments: 11/11/2010PassJohn BerrySidewalk Inspection Street side walk looks goodInspector Comments: 02/11/2011FailJohn BerryCommercial Building Final - 1 Restroom must be ADA compliant sunk toilet (Grab Bars) - Insulation in floor falling down - secure insulation - Install 2A10BC Fire Ext near front door. Inspector Comments: 03/11/2011PassJohn BerryCommercial Building Final BLDG Final Completed Accessible Placard needed for accessible restroom centered 60" above floor & left of door Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00095 Merrell Dental Office 1183 Summers Dr New Commercial Building Permit Status of (Open) as of Report Date: 06/29/2020 8:58 am Permit Inspection Summary Electrical 09/13/2010PassJohn MillarCommercial Electrical Rough-in nail plates in mech rm staples with-in 8" of box's Was done while I was here East side of building it still unfinished. Inspector Comments: 02/11/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection -Covers Missing in north small room - switches - A/c unit needs disconnect mounted - lank cover needed west wall up high. - TV's in ceiling need receptacle mounted in ceiling grid - cords cannot go through tile ceiling - med gas room will check for clearance panel *East side is unfinished Inspector Comments: 03/08/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection A/C unit disconnect not mounted outside call for a reinspect when ready Inspector Comments: Mechanical 09/13/2010N/AJohn BerryHVAC Rough-in Not readyInspector Comments: 10/25/2010PassQuinton OwensHVAC Rough-in Kyle 313-3388 Pressure test 20psi@10:36, 20psi @ 10:56 Mech. Rough-in approved with exception -clearance required around water heater vent Inspector Comments: 02/11/2011FailJohn BerryHVAC Final Inspection Finish Return Ducting - crawlspace ducting must be insulated or exterior walls insulated to R-13 min Ducting R-8min Inspector Comments: 03/11/2011PassJohn BerryHVAC Final Inspection HVAC Completed, TJI Furnace Returns need to be insulatedInspector Comments: Plumbing 09/20/2010PassBrad JohnsonPlumbing Rough-in Approved for DWV and water piping. All corrections have been made. Good for cover. Inspector Comments: 02/11/2011N/APLL ADMINPlumbing Final Inspection Unsigned Inspection Ticket Notes - Install Back flow devices on plaster grinder, film developer, and vacuum Inspector Comments: Page 2 of 2