HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00095 - Merrell Dental OfficePermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/29/2020 8:58 am
Permit Details Permit Number: 10-00095
Merrell Dental Office
1183 Summers Dr
New Commercial Building
Permit Issued Date:
Permit Inspection Statistics
19Total Inspections Completed:
12Total Inspections Passed:
Inspection Pass Rate: 63.16%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
05/17/2010PassJohn BerrySidewalk Inspection
Maintain 11/2 B of sidewalk to bldg EavesInspector Comments:
06/10/2010PassJohn BerryCommercial Footing Inspection
Layout looks good
Footing & rebar looks good
Inspector Comments:
06/22/2010PassJohn BerryFoundation Inspection
Foundation & rebar looks good.Inspector Comments:
09/20/2010PassJohn BerryCommercial Framing/Structure Inspection
-Anchor bolts needed in bearing walls in basement
-grinder trusses need more studs at bearing points
Inspector Comments:
09/20/2010N/AJohn BerryCommercial Framing/Structure Inspection
Not readyInspector Comments:
09/21/2010PassJohn BerryCommercial Insulation Inspection
Insulation in west end of building ok to cover after allowing to dry note: East ext.
walls are not insulated.
Inspector Comments:
09/24/2010PassTed DyeResidential Sheetrock/Drywall Inspection
All type x fire code rock nail patterns look good.Inspector Comments:
11/11/2010PassJohn BerrySidewalk Inspection
Street side walk looks goodInspector Comments:
02/11/2011FailJohn BerryCommercial Building Final
- 1 Restroom must be ADA compliant sunk toilet (Grab Bars) - Insulation in floor
falling down - secure insulation - Install 2A10BC Fire Ext near front door.
Inspector Comments:
03/11/2011PassJohn BerryCommercial Building Final
BLDG Final Completed
Accessible Placard needed for accessible restroom centered 60" above floor & left
of door
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00095
Merrell Dental Office
1183 Summers Dr
New Commercial Building
Permit Status of (Open) as of Report Date: 06/29/2020 8:58 am
Permit
Inspection
Summary
Electrical
09/13/2010PassJohn MillarCommercial Electrical Rough-in
nail plates in mech rm staples with-in 8" of box's
Was done while I was here
East side of building it still unfinished.
Inspector Comments:
02/11/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
-Covers Missing in north small room - switches - A/c unit needs disconnect
mounted - lank cover needed west wall up high. - TV's in ceiling need receptacle
mounted in ceiling grid - cords cannot go through tile ceiling - med gas room will
check for clearance panel *East side is unfinished
Inspector Comments:
03/08/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
A/C unit disconnect not mounted outside
call for a reinspect when ready
Inspector Comments:
Mechanical
09/13/2010N/AJohn BerryHVAC Rough-in
Not readyInspector Comments:
10/25/2010PassQuinton OwensHVAC Rough-in
Kyle 313-3388
Pressure test 20psi@10:36, 20psi @ 10:56
Mech. Rough-in approved with exception -clearance required around water
heater vent
Inspector Comments:
02/11/2011FailJohn BerryHVAC Final Inspection
Finish Return Ducting - crawlspace ducting must be insulated or exterior walls
insulated to R-13 min Ducting R-8min
Inspector Comments:
03/11/2011PassJohn BerryHVAC Final Inspection
HVAC Completed, TJI Furnace Returns need to be insulatedInspector Comments:
Plumbing
09/20/2010PassBrad JohnsonPlumbing Rough-in
Approved for DWV and water piping. All corrections have been made. Good for
cover.
Inspector Comments:
02/11/2011N/APLL ADMINPlumbing Final Inspection
Unsigned Inspection Ticket
Notes - Install Back flow devices on plaster grinder, film developer, and vacuum
Inspector Comments:
Page 2 of 2