HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00114 - Nauvoo House II Bldg #5Permit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/24/2020 8:46 am
Permit Details Permit Number: 10-00114
Nauvoo House II Bldg #5
175 W 5th S
New Multi-Family Residence
Permit Issued Date: 05/06/2010
Permit Inspection Statistics
15Total Inspections Completed:
10Total Inspections Passed:
Inspection Pass Rate: 66.67%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
05/24/2010N/APLL ADMINCommercial Footing Inspection
*Not signed Notes"Footing Rebar & Forms look good"Inspector Comments:
06/14/2010PassJohn BerryFoundation Inspection
Floor Rebar looks goodInspector Comments:
08/19/2010PassJohn BerrySheeting
Sheeting Nailing per shear wall plans All bldgs 5-9Inspector Comments:
09/01/2010FailJohn BerryCommercial Framing/Structure Inspection
HOU- S. Unit - nut missing screws missing MSTC Straps missing walkway side
2nd and 3rd florrs
OK to insulate
Inspector Comments:
09/07/2010PassJohn BerryCommercial Sheetrock/Drywall Inspection
1st Layer on ceiling all 3 floors of bldg 5 OK to coverInspector Comments:
09/07/2010PassJohn BerryCommercial Framing/Structure Inspection
Framing Re-insp okInspector Comments:
09/13/2010FailJohn BerryCommercial Insulation Inspection
Middle unit 3rd floor not completedInspector Comments:
09/13/2010PassJohn BerryCommercial Insulation Inspection
Seal Around windows on 3rd floor unitsInspector Comments:
01/26/2011FailJohn BerryCommercial Building Final
Install 2AIDBC Fire EXT in Each UnitInspector Comments:
Electrical
10/18/2010PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power.Inspector Comments:
01/20/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final & C.O. #5Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00114
Nauvoo House II Bldg #5
175 W 5th S
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 06/24/2020 8:46 am
Permit
Inspection
Summary
Mechanical
08/27/2010PassJohn BerryHVAC Rough-in
HVAC Rough BLDG 5 Looks Good Bring Det. specs to jobInspector Comments:
01/14/2011FailJohn BerryHVAC Final Inspection
-Handrails req'd both sides on steps -guard rails req'd on walks with drop offs at
sides -Install covers on dryer vents
Interior HVAC & Building looks good
Inspector Comments:
01/19/2011PassJohn BerryHVAC Final Inspection
HVAC Final CW Except BoilerInspector Comments:
01/27/2011PassJohn BerryHVAC Final Inspection
Page 2 of 2