Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 06/19/2020 cloudy 6:30 am 41 11:30 am I observed the placement of concrete within Building 9 for the western stair way. I observed that the first truck did not contain fibers within the concrete. The contractor went forward and placed the concrete. I observed that the 2nd truck had fiber. I observed the concrete was in general conformance to project documents. I observed the concrete was in general conformance to project documents. I observed the duration of the pour. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.22 08:24:53 -06'00'8129697 2nd truck with fibers in concrete F. Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: