HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Construction 06/19/2020
cloudy
6:30 am
41
11:30 am
I observed the placement of concrete within Building 9 for the western stair way. I observed that the first
truck did not contain fibers within the concrete. The contractor went forward and placed the concrete. I
observed that the 2nd truck had fiber. I observed the concrete was in general conformance to project
documents. I observed the concrete was in general conformance to project documents. I observed the
duration of the pour.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.22 08:24:53
-06'00'8129697
2nd truck with fibers in concrete
F. Pelton