Loading...
HomeMy WebLinkAboutSOIL DENSITY - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл The Grove 20001 Stillwater Equity Partners Kevin Virgin Construction Jun 19, 2020 F. Pelton 8:45 AM 11:45 AM 3491 719 2806 12Top of finish grade 4.7 132 95% Approximately A.5 and 3.5 of building 5 Top of finish grade Pit Run 95% 132 4.1 125.3 130.4 95% 132 3.1 125.3 129.2 Pit Run Top of finish grade Approximately B.5 and 3.5 of building 5 95% 132 4.3 125.2 130.6 Pit Run Top of finish grade Approximately B.5 and 1.5 of building 5 95% 132 4.4 125.7 131.2 Pit Run Top of finish grade Approximately C.5 and 3.5 of building 5 97% 132 3.1 127.7 131.6 Pit Run Top of finish grade Approximately C.5 and 1.5 of building 5 96% 132 4.3 126.3 131.7 Pit Run Top of finish grade Approximately D.5 and 3.5 of building 5 Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.22 08:15:35 -06'00' 12 12 12 12 12 12 1 126 131.8Approximately A.5 and 1.5 of building 5 Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 95% 132 4.8 125.8 131.9 Pit Run Top of finish grade Approximately D.5 and 1.5 of building 5 132 96% 3.8 126.4 131.3 Pit Run Top of finish grade Approximately E.5 and 3.5 of building 5 132 98% 3.3 129.1 133.3 Pit Run Top of finish grade Approximately E.5 and 1.5 of building 5 12 12 12 8 9 10