Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00152 - Nauvoo House II Bldg #6Permit Inspection Summary Permit Status of (Open) as of Report Date: 06/23/2020 1:16 pm Permit Details Permit Number: 10-00152 Nauvoo House II Bldg #6 175 W 5th S New Multi-Family Residence Permit Issued Date: 05/06/2010 Permit Inspection Statistics 14Total Inspections Completed: 12Total Inspections Passed: Inspection Pass Rate: 85.71% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 06/02/2010PassJohn BerryCommercial Footing Inspection Footing & Rebar look goodInspector Comments: 06/03/2010PassJohn BerryCommercial Footing Inspection Footing & Rebar look goodInspector Comments: 06/09/2010PassQuinton OwensFoundation Inspection Foundation Rebar okInspector Comments: 09/14/2010PassJohn BerryCommercial Framing/Structure Inspection Framing inspection Looks good Note: Bath exhaust fans need fire caulking around plastic back draft damper 1st and 2nd floors only Inspector Comments: 09/17/2010PassJohn BerryCommercial Insulation Inspection Insulation OKInspector Comments: 09/20/2010PassJohn BerryResidential Sheetrock/Drywall Inspection 1st Layer Looks Good OK to cover Add Blocking at dropped ceilingInspector Comments: 01/26/2011FailJohn BerryCommercial Building Final Install ZAIDBC Min Fire Ext in Each unitInspector Comments: Electrical 10/18/2010PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent powerInspector Comments: 01/20/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final & CO #6Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00152 Nauvoo House II Bldg #6 175 W 5th S New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/23/2020 1:16 pm Permit Inspection Summary Fire 09/15/2010PassJohn BerryFire Sprinkler Hydro 226#@2pm 226 4:40 OK GoodInspector Comments: 01/28/2011N/APLL ADMINFire Alarm Final Inspection NOT SIGNED Notes - Flow Switches working (2). Tower Switches working(4) - Heads need to be cleaned throughout - Pressure test completed by Brad previously(200psi/2hr) - Need 16' Head coverage literature. (ok) - Extra Heads on site *Clearance around riser 2' *ok per Brad. *Static 50 psi both. Residual 45psi Inspector Comments: Mechanical 09/10/2010PassQuinton OwensHVAC Rough-in Mech Rough in OK *Hydronic heating lines test inspected by BradInspector Comments: 12/16/2010PassQuinton OwensHVAC Final Inspection 42 psi @ 5:05, 42 psi @ 5:30Inspector Comments: 01/19/2011PassJohn BerryHVAC Final Inspection HVAC Final Apts Completed Except BoilerInspector Comments: Page 2 of 2