Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00153 - Nauvoo House II Bldg #7Permit Inspection Summary Permit Status of (Open) as of Report Date: 06/23/2020 1:15 pm Permit Details Permit Number: 10-00153 Nauvoo House II Bldg #7 175 W 5th S New Multi-Family Residence Permit Issued Date: 05/06/2010 Permit Inspection Statistics 10Total Inspections Completed: 8Total Inspections Passed: Inspection Pass Rate: 80.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 06/18/2010PassJohn BerryCommercial Footing Inspection Footing & Rebar for bldg 7 & Floor Rebar for Bldg 6 look goodInspector Comments: 06/24/2010PassJohn BerryFoundation Inspection Foundation Bldg 7 ok to pourInspector Comments: 01/27/2011FailJohn BerryCommercial Building Final Install ZAIDBC Fire Ext in each unitInspector Comments: Electrical 09/24/2010PassBret StoddardCommercial Electrical Rough-in Approved for cover in #7 except service walls. *Approved for cover in #6 As per prior inspection(Jack) Inspector Comments: 10/18/2010PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for perm powerInspector Comments: 01/20/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final & C.O. #7Inspector Comments: Fire 10/21/2010PassBrad JohnsonFire Sprinkler Hydro Fire riser 200 psi test complete: Required flush by Jon BerryInspector Comments: 02/02/2011PassJohn BerryFire Sprinkler Final Inspection 205# @ 1:30 for both 7&8 pressure ok good at 3:30 ADA Unit Horn Strobes OK'd good & Alarm Bell Inspector Comments: Mechanical 09/16/2010FailJohn BerryHVAC Rough-in Several units - bath exh fans req fire caulck 1/4" at box-pipe connectionInspector Comments: 01/19/2011PassJohn BerryHVAC Final Inspection HVAC Final Apts Completed Except BoilerInspector Comments: