Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00155 - Nauvoo House II Bldg #9Permit Inspection Summary Permit Status of (Open) as of Report Date: 06/23/2020 1:13 pm Permit Details Permit Number: 10-00155 Nauvoo House II Bldg #9 175 W 5th S New Multi-Family Residence Permit Issued Date: 05/06/2010 Permit Inspection Statistics 19Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 78.95% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 07/14/2010PassJohn BerryCommercial Footing Inspection footing & rebar look goodInspector Comments: 07/21/2010PassJohn BerryCommercial Footing Inspection Footing & Rebar look goodInspector Comments: 07/26/2010PassJohn BerryFoundation Inspection Foundation & rebar look goodInspector Comments: 10/13/2010FailJohn BerryCommercial Framing/Structure Inspection -hold downs missing anchor bolts or nuts - anchor bolts needed in bearing walls 1st floor - bath exhaust fan box 1st floor east unit needs fire caulk - fire caulk excessive on empty holes in plumbing walls 2nd and 3rd floors Inspector Comments: 10/13/2010PassJohn BerryCommercial Insulation Inspection -Windows sealing has numerous gaps - many places insulation to short holes need filling *Originally failed on 10/13/2010 Inspector Comments: 10/15/2010N/AQuinton OwensCommercial Sheetrock/Drywall Inspection 1st of 2 layers installed on ceilings except 1st level east nit Finish fastening drywall Inspector Comments: 10/25/2010PassTed DyeCommercial Framing/Structure Inspection was sheet rocked when looked @ monday morningInspector Comments: 02/22/2011FailJohn BerryCommercial Building Final ADA Unit - Install grab bars install scald guards under sinks Complete landscaping & exterior Inspector Comments: 02/23/2011PassJohn BerryCommercial Building Final Previous items completed ADAInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00155 Nauvoo House II Bldg #9 175 W 5th S New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/23/2020 1:13 pm Permit Inspection Summary Electrical 10/07/2010PassBret StoddardCommercial Electrical Rough-in Approved for cover on entire buildingInspector Comments: 11/05/2010PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent powerInspector Comments: 02/22/2011PassPLL ADMINCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Signed by Jane Shaw Notes: #118 unused openings in panel must be closed (fixed while I was here) Inspector Comments: Fire 10/11/2010PassJohn BerryFire Sprinkler Hydro 02/22/2011PassBrad JohnsonFire Department Final Inspection Approved for occupancyInspector Comments: Mechanical 02/22/2011PassJohn BerryHVAC Final Inspection HVAC Final completedInspector Comments: Plumbing 08/04/2010PassBrad JohnsonPlumbing Underground Inspection Approved for coverInspector Comments: 10/07/2010FailQuinton OwensPlumbing Rough-in -East end 1st floor one bath fan vent not fire caulked around plastic fitting - east end 2nd floor unit not ready not all ducts sealed no furnce Inspector Comments: 01/28/2011PassJohn BerryPlumbing Rough-in Gas line tested good at 35#Inspector Comments: 02/22/2011PassBrad JohnsonPlumbing Final Inspection Approved for occupancyInspector Comments: Page 2 of 2