HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00155 - Nauvoo House II Bldg #9Permit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/23/2020 1:13 pm
Permit Details Permit Number: 10-00155
Nauvoo House II Bldg #9
175 W 5th S
New Multi-Family Residence
Permit Issued Date: 05/06/2010
Permit Inspection Statistics
19Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate: 78.95%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
07/14/2010PassJohn BerryCommercial Footing Inspection
footing & rebar look goodInspector Comments:
07/21/2010PassJohn BerryCommercial Footing Inspection
Footing & Rebar look goodInspector Comments:
07/26/2010PassJohn BerryFoundation Inspection
Foundation & rebar look goodInspector Comments:
10/13/2010FailJohn BerryCommercial Framing/Structure Inspection
-hold downs missing anchor bolts or nuts - anchor bolts needed in bearing walls
1st floor - bath exhaust fan box 1st floor east unit needs fire caulk - fire caulk
excessive on empty holes in plumbing walls 2nd and 3rd floors
Inspector Comments:
10/13/2010PassJohn BerryCommercial Insulation Inspection
-Windows sealing has numerous gaps - many places insulation to short holes
need filling *Originally failed on 10/13/2010
Inspector Comments:
10/15/2010N/AQuinton OwensCommercial Sheetrock/Drywall Inspection
1st of 2 layers installed on ceilings except 1st level east nit Finish fastening
drywall
Inspector Comments:
10/25/2010PassTed DyeCommercial Framing/Structure Inspection
was sheet rocked when looked @ monday morningInspector Comments:
02/22/2011FailJohn BerryCommercial Building Final
ADA Unit - Install grab bars install scald guards under sinks Complete landscaping
& exterior
Inspector Comments:
02/23/2011PassJohn BerryCommercial Building Final
Previous items completed ADAInspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00155
Nauvoo House II Bldg #9
175 W 5th S
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 06/23/2020 1:13 pm
Permit
Inspection
Summary
Electrical
10/07/2010PassBret StoddardCommercial Electrical Rough-in
Approved for cover on entire buildingInspector Comments:
11/05/2010PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent powerInspector Comments:
02/22/2011PassPLL ADMINCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Signed by Jane Shaw Notes: #118 unused openings in panel must be closed
(fixed while I was here)
Inspector Comments:
Fire
10/11/2010PassJohn BerryFire Sprinkler Hydro
02/22/2011PassBrad JohnsonFire Department Final Inspection
Approved for occupancyInspector Comments:
Mechanical
02/22/2011PassJohn BerryHVAC Final Inspection
HVAC Final completedInspector Comments:
Plumbing
08/04/2010PassBrad JohnsonPlumbing Underground Inspection
Approved for coverInspector Comments:
10/07/2010FailQuinton OwensPlumbing Rough-in
-East end 1st floor one bath fan vent not fire caulked around plastic fitting - east
end 2nd floor unit not ready not all ducts sealed no furnce
Inspector Comments:
01/28/2011PassJohn BerryPlumbing Rough-in
Gas line tested good at 35#Inspector Comments:
02/22/2011PassBrad JohnsonPlumbing Final Inspection
Approved for occupancyInspector Comments:
Page 2 of 2