HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00162 - Ray's Chevron Car WashPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/23/2020 1:07 pm
Permit Details Permit Number: 10-00162
Ray's Chevron Car Wash
279 N 2nd E
New Commercial Building
Permit Issued Date: 06/04/2010
Permit Inspection Statistics
15Total Inspections Completed:
13Total Inspections Passed:
Inspection Pass Rate: 86.67%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
06/16/2010PassJohn BerryCommercial Footing Inspection
rebar and forms look goodInspector Comments:
06/22/2010PassJohn BerryFoundation Inspection
Rebar and Forms for sand separator look goodInspector Comments:
06/25/2010PassJohn BerryCommercial Footing Inspection
Footing and Rebar look goodInspector Comments:
06/29/2010PassJohn BerryFoundation Inspection
foundation and rebar look goodInspector Comments:
07/06/2010PassJohn BerryCommercial Footing Inspection
Rebar for center drain floor looks goodInspector Comments:
07/09/2010PassJohn BerryFoundation Inspection
Foundation and rebar look goodInspector Comments:
08/10/2010PassJohn BerryCommercial Framing/Structure Inspection
Sheathing for electrical room looks goodInspector Comments:
08/26/2010PassJohn BerryCommercial Framing/Structure Inspection
Framing OK Need steal bolting jusp deportInspector Comments:
09/14/2010PassJohn BerryCommercial Insulation Inspection
Wall insulation looks goodInspector Comments:
11/04/2010PassQuinton OwensCommercial Building Final
Exterior siding not complete (finish on temp C.O.) 11/05 Mech equipment
secured to grating
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00162
Ray's Chevron Car Wash
279 N 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 06/23/2020 1:07 pm
Permit
Inspection
Summary
Electrical
08/13/2010PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent powerInspector Comments:
10/29/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Finish up loose endsInspector Comments:
12/01/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
-Verify listing - Transformers(2). Install cover outside mech rm outletInspector Comments:
12/21/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final & co Transformer is apart of systemInspector Comments:
Plumbing
11/05/2010PassJohn MillarPlumbing Final Inspection
Reinspect on hangers and ASV for hose bib's complete final approvedInspector Comments:
Page 2 of 2