Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00162 - Ray's Chevron Car WashPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/23/2020 1:07 pm Permit Details Permit Number: 10-00162 Ray's Chevron Car Wash 279 N 2nd E New Commercial Building Permit Issued Date: 06/04/2010 Permit Inspection Statistics 15Total Inspections Completed: 13Total Inspections Passed: Inspection Pass Rate: 86.67% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 06/16/2010PassJohn BerryCommercial Footing Inspection rebar and forms look goodInspector Comments: 06/22/2010PassJohn BerryFoundation Inspection Rebar and Forms for sand separator look goodInspector Comments: 06/25/2010PassJohn BerryCommercial Footing Inspection Footing and Rebar look goodInspector Comments: 06/29/2010PassJohn BerryFoundation Inspection foundation and rebar look goodInspector Comments: 07/06/2010PassJohn BerryCommercial Footing Inspection Rebar for center drain floor looks goodInspector Comments: 07/09/2010PassJohn BerryFoundation Inspection Foundation and rebar look goodInspector Comments: 08/10/2010PassJohn BerryCommercial Framing/Structure Inspection Sheathing for electrical room looks goodInspector Comments: 08/26/2010PassJohn BerryCommercial Framing/Structure Inspection Framing OK Need steal bolting jusp deportInspector Comments: 09/14/2010PassJohn BerryCommercial Insulation Inspection Wall insulation looks goodInspector Comments: 11/04/2010PassQuinton OwensCommercial Building Final Exterior siding not complete (finish on temp C.O.) 11/05 Mech equipment secured to grating Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00162 Ray's Chevron Car Wash 279 N 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 06/23/2020 1:07 pm Permit Inspection Summary Electrical 08/13/2010PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent powerInspector Comments: 10/29/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Finish up loose endsInspector Comments: 12/01/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection -Verify listing - Transformers(2). Install cover outside mech rm outletInspector Comments: 12/21/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final & co Transformer is apart of systemInspector Comments: Plumbing 11/05/2010PassJohn MillarPlumbing Final Inspection Reinspect on hangers and ASV for hose bib's complete final approvedInspector Comments: Page 2 of 2