Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00184 - 2281 W 960 S - New SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/23/2020 12:45 pm Permit Details Permit Number: 10-00184 2281 W 960 S - New SFR 2281 W 960 S New Single Family Residence Permit Issued Date: 09/27/2010 Permit Inspection Statistics 19Total Inspections Completed: 16Total Inspections Passed: Inspection Pass Rate: 84.21% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 10/12/2010PassTed DyeResidential Footing Inspection User on NW Corner of garage (west wall)Inspector Comments: 10/14/2010PassTed DyeFoundation Inspection 11/03/2010PassTed DyeSheeting Sheeting onlyInspector Comments: 11/12/2010FailTed DyeResidential Framing/Structure Inspection Finish nailing or peplace nails in hangers in living room Fire blocking needed in furdowns Diagnol nails need in joist hangers in NE Bedroom top step over need cutt back to match lower step over hangs Inspector Comments: 11/15/2010PassTed DyeResidential Framing/Structure Inspection 11/18/2010PassTed DyeResidential Insulation Inspection 11/23/2010PassPLL ADMINResidential Sheetrock/Drywall Inspection Not Signed *Notes: Fire code on up stair ceiling nails pattern goodInspector Comments: 12/21/2010PassQuinton OwensResidential Building Final bldg final okInspector Comments: Electrical 10/29/2010PassBret StoddardResidential Electrical Service Inspection Approved to be energized for permanent powerInspector Comments: 11/12/2010PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover - see notes below *Need nail plate for ser if drywalling garage Inspector Comments: 12/21/2010PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection -Re-inspect 12/23 AM Approved for a final and COInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00184 2281 W 960 S - New SFR 2281 W 960 S New Single Family Residence Permit Status of (Open) as of Report Date: 06/23/2020 12:45 pm Permit Inspection Summary Mechanical 11/10/2010FailJohn BerryHVAC Rough-in Install insulation shield to water heater vent in attic 25#@ 1pm gas line tested good Install shield call 716-1323 when completed Inspector Comments: 11/15/2010PassQuinton OwensHVAC Rough-in Insulation shield installedInspector Comments: 12/22/2010FailJohn BerryHVAC Final Inspection -Secure water heater gas line - Water heater vent must have 1" clearance to combustibles including insulation - Need to see water heater insulation shield in attic Inspector Comments: 12/29/2010PassJohn BerryHVAC Final Inspection HVAC Final completedInspector Comments: Plumbing 10/18/2010PassBrad JohnsonPlumbing Sewer Approved for coverInspector Comments: 10/21/2010PassBrad JohnsonPlumbing Underground Inspection Approved for coverInspector Comments: 11/08/2010PassJohn MillarPlumbing Rough-in Rough plumbing inspection approvedInspector Comments: 12/22/2010PassBrad JohnsonPlumbing Final Inspection ApprovedInspector Comments: Page 2 of 2