Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - SundanceProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Sundance Apartments 20016 Steven's Construction Lane Webb Construction 06/12/2020 Sunny 10:00 AM 57 12:30 PM I arrived at the project site and observed the concrete reinforcement and concrete placement of the north, northwest, and northeast sections of the building. I observed that the concrete reinforcement was in general conformance to project documents. I observed that the placement of the concrete was in general conformance to project documents. I observed for the duration of the pour. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.16 07:25:01 -06'00'8129697 Concrete Reinforcement Concrete Reinforcement F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: