HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - SundanceProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Sundance Apartments
20016
Steven's Construction
Lane Webb Construction 06/12/2020
Sunny
10:00 AM
57
12:30 PM
I arrived at the project site and observed the concrete reinforcement and concrete placement of the north,
northwest, and northeast sections of the building. I observed that the concrete reinforcement was in
general conformance to project documents. I observed that the placement of the concrete was in general
conformance to project documents. I observed for the duration of the pour.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.16 07:25:01
-06'00'8129697
Concrete Reinforcement Concrete Reinforcement
F Pelton
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: