HomeMy WebLinkAboutFOOTING CONCRETE TEST 5 - Thomson Farms - Footings Bldg 5Project Name:
Client:
Mix Number:
Project Number:
Ticket Number:
Load Amount:
Admixtures:
Tested By:
Date and Time:
Compressive Strength of Concrete Test Specimens
Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511)
Slump (Inches):
Entrained Air (%):
Concrete Temperature:
Ambient Temperature:
Test Results:Minimum:Maximum:
Cylinder #
Lab Test Data: (ASTM C39, C42, C617, and C1231)
Break Age
Cylinder
Diameter (in)
Area
(in² )
Break
Date
Maximum Load
(lbs)
Break
Type
Compressive
Strength (psi)Required 28 day
Strength (psi)
°F
°F
Reviewed By:
Supplier:
Test Location:
Unit Weight (PCF):Set # :
Cylinders Picked Up By: Date and Time:
Hi / Low Temperatures
Remarks:
28-day Average Strength
The Grove
Still Water Equity Partnership
170 TF
20001
14609
130 of 140
Super Plasticizer, MS AC 534, MP 322
D. Aust
06/09/2020 7:00 AM
7.5
4.7
55.7
56.7
8
4.5 7.5
122A
122E
122C
122B
122D
4 06/16/20
07/07/20
07/07/20
07/07/20
32,790 5 3,0002,60812.57
Walter's Ready Mix
BLDG 12 Footings
7
28
28
28
H
This concrete was intended for the slab on grade pour
at bldg 8, but was overestimated. It has a higher design
strength, and they added more air before the pour to
keep it in spec with footing concrete.
139 3
D. Aust 06/10/2020 5:00PM