Loading...
HomeMy WebLinkAboutFOOTING CONCRETE TEST 5 - Thomson Farms - Footings Bldg 5Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength The Grove Still Water Equity Partnership 170 TF 20001 14609 130 of 140 Super Plasticizer, MS AC 534, MP 322 D. Aust 06/09/2020 7:00 AM 7.5 4.7 55.7 56.7 8 4.5 7.5 122A 122E 122C 122B 122D 4 06/16/20 07/07/20 07/07/20 07/07/20 32,790 5 3,0002,60812.57 Walter's Ready Mix BLDG 12 Footings 7 28 28 28 H This concrete was intended for the slab on grade pour at bldg 8, but was overestimated. It has a higher design strength, and they added more air before the pour to keep it in spec with footing concrete. 139 3 D. Aust 06/10/2020 5:00PM