HomeMy WebLinkAboutMEETING NOTES 6-18-2020 - 20-00411 - 425 S Harvard Ave - Duplexes - Blake Willis - Site PlanBlake Willis Duplex (Water, Sewer, & Storm Drain) Meeting
6/18/2020, 9 AM, Building Dept. Conference Room
Project location: 425 Harvard Ave, Permit 20-00411
Blake Willis, Bret Stoddard, Alan Parkinson, Stan Crittenden, Don Allen
Minutes taken by Annie Kuta
Fire Hydrant
Fire hydrant already in place (acknowledged by Stan)
Need Fire hydrant between Building 2 &3?
Already have one by Building 4
Water Lines
Water main may interfere with Building 4
Water line 11 foot setback on North, 22 foot on South
Each building will have own water meter, each meter line goes directly to city line. Same with Sewer line.
May need Utility Easement for water/sewer lines to individual buildings if line crosses property of other building.
4 1” lines coming off main in cul-de-sac (a possibility to avoid needing easement)
Preferred placement: Buildings 1 & 4 water line come from sidewalk, Buildings 2 & 3 through cul-de-sac, lines 1-2 feet apart.
Storm Drain
All drainage needs to remain on site.
No storm drainage currently
Possibility: Create retention pond North (Northwest) of Building 1 or French Drain.
Surface water calculation (area * .9/12 * .9) or (area*.9/12*.7 for grassy areas) = cubic feet volume
Sewer
Need manhole in cul-de-sac
Building 2, 3, 4 to manhole in cul-de-sac
Building 1 could attach by street/sidewalk
8” line from manhole to city main, 4” line from building to manhole
Sewer 5 ½ feet deep at North end, 7 ½ feet deep at South end
Dumpsters
4 90-gallon canisters
45’ radius for trucks to turn around in cul-de-sac (need to verify dimensions with Keith)
May need to have tenants wheel cans to street curb
Need to address neighbor’s dumpsters on the property
Buildings 1900 square feet with 2 car garage (400-500 square feet)
Fencing around property, talk with neighbor to South about shifting fence line back to her property line. Need to have required visibility near right of way access