Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 7 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 06/10/2020 Sunny 7:00 AM 80 4:30 PM I arrived on site at approximately 7:30 AM. I observed that the contractor had prepared the breezeways for concrete. I observed that the preparations were in general conformance with project documents. I returned at approximately 2:00 PM and observed that the contractor had prepared the footings and footing walls in another building. I observed that they were in general conformance with project documents as well. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.11 07:20:52 -06'00'8129697 Footing Walls Footings D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: