Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 5 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Highwater 06/05/2020 Sunny 10:30 AM 80 12:30 PM I arrived on site at approximately 11:00 AM. I observed that the contractor had prepared the bolts and bolt holes previously, including cleaning out the holes. I observed that the epoxy was not expired. I observed the contractor fill the holes with epoxy and then insert the metal rods. The holes had enough epoxy that a little bit came out of the holes each time. I also found 5 holes that were not clean enough and instructed the contractor to clean them out more thoroughly. I again inspected the holes to ensure that the proper cleanliness had been achieved. I observed the placement of approximately 20 holes. I observed the contractor was in general conformance to project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.08 07:28:33 -06'00'8129697 Rod inserted into hole with epoxy Rod inserted into hole with epoxy Rod inserted into hole with epoxy D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: Epoxy bottle expiring 01/2021 Epoxy bottle expiring 01/2021