Loading...
HomeMy WebLinkAboutCONCRETE TEST - Thomson Farms - Bldg 12Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл The Grove Still Water Equity Partnership 183 20001 14563 11 yards of 22 MP 322, MA AE 90, Super Plasticizer N Steiner 06/05/2020 3:00 PM 6.5 4.6 75.5 86.7 8 4.5 7.5 116A 116E 116C 116B 116D 4 06/12/20 07/03/20 07/03/20 07/03/20 38,720 5 3,0003,08012.57 Walter's Ready Mix Bldg 12 footing walls 7 28 28 28 H 145.2 1 N. Steiner 6/6/2020 8:00 AM