Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - Bld 12 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Hill & Son 06/05/2020 Sunny 2:15 PM 85 5:45 PM I arrived on site at approximately 2:30 PM. I tested the concrete pour on Bldg. 12 at 3:15, and then tested densities on the water line at 4:30. I observed that the concrete contractor had placed the reinforced steel in general conformance with project documents. II observed the concrete placement was in general conformance to project documents. I observed that the excavation contractor had backfilled along the water line, and he was using a hoepack to achieve compaction. I retrieved a sample of the backfill material to run proctor and gradation tests on it. The material seemed to be around a 123-125 proctor. I observed that the contractor used the same means and methods of compaction for the mixed material that he had used on other materials that successfully achieved compaction. I observed the excavation and backfill to be in general conformance with project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.08 07:32:42 -06'00'8129697 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: