HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - Bld 12 - The Grove at Thomson FarmsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Hill & Son 06/05/2020
Sunny
2:15 PM
85
5:45 PM
I arrived on site at approximately 2:30 PM. I tested the concrete pour on Bldg. 12 at 3:15, and then tested
densities on the water line at 4:30. I observed that the concrete contractor had placed the reinforced steel
in general conformance with project documents. II observed the concrete placement was in general
conformance to project documents. I observed that the excavation contractor had backfilled along the
water line, and he was using a hoepack to achieve compaction. I retrieved a sample of the backfill material
to run proctor and gradation tests on it. The material seemed to be around a 123-125 proctor. I observed
that the contractor used the same means and methods of compaction for the mixed material that he had
used on other materials that successfully achieved compaction. I observed the excavation and backfill to
be in general conformance with project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.08 07:32:42
-06'00'8129697
D. Aust
Page 2 of 2