HomeMy WebLinkAboutSOIL DENSITY 2 - 19-00733 & 19-00734 - The Grove at Thomson Farms - 30 Unit Bldg 2 & 1In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms
20001
Still Water Equity
Hill and Sons Excavation
Jun 9, 2020 L. Camarillo
1:30 PM 6:00 PM
867
1163 5214
8~6' below finished grade 10.3
123.3
98%
Bedding for pipeline between buildings 8 and 9. ~50' east from
western end.
~6' below finished grade
Native soil.
101%
123.3
8.6
124.1
134.8
95%
123.3
9.2
116.9
127.6
Native soil.
~3' below finished grade
Bedding for pipeline between buildings 8 and 9. Western end.
100%
123.3
8
123.2
133.1
Native soil.
~3' below finished grade
Bedding for pipeline between buildings 8 and 9. ~50' east from
western end.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.10 07:29:18
-06'00'
8
12
12
1
121
132.9Bedding for pipeline between buildings 8 and 9. Western end.
Native soil.
2
3
4