Loading...
HomeMy WebLinkAboutSOIL DENSITY 2 - 19-00733 & 19-00734 - The Grove at Thomson Farms - 30 Unit Bldg 2 & 1In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms 20001 Still Water Equity Hill and Sons Excavation Jun 9, 2020 L. Camarillo 1:30 PM 6:00 PM 867 1163 5214 8~6' below finished grade 10.3 123.3 98% Bedding for pipeline between buildings 8 and 9. ~50' east from western end. ~6' below finished grade Native soil. 101% 123.3 8.6 124.1 134.8 95% 123.3 9.2 116.9 127.6 Native soil. ~3' below finished grade Bedding for pipeline between buildings 8 and 9. Western end. 100% 123.3 8 123.2 133.1 Native soil. ~3' below finished grade Bedding for pipeline between buildings 8 and 9. ~50' east from western end. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.10 07:29:18 -06'00' 8 12 12 1 121 132.9Bedding for pipeline between buildings 8 and 9. Western end. Native soil. 2 3 4