Loading...
HomeMy WebLinkAboutCONCRETE SPECIAL INSPECTION - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 06/11/2020 Sunny 11:00 AM 79 6:30 PM I arrived on site and began my observations of the placement and reinforcement of the concrete for the exterior walls of building 5. I observed the concrete reinforcement was in general conformance to project plans. I observed the concrete placement was within general conformance to project documents. I observed the concrete placement for the duration of the pour. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.12 07:53:58 -06'00'8129697 Concrete reinforcement Concrete reinforcement F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: