HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00246 - 111 S Harvard - New SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am Permit Details Permit Number: 10-00246 111 S Harvard - New SFR 111 S Harvard New Single Family Residence Permit Issued Date: Permit Inspection Statistics 19Total Inspections Completed: 16Total Inspections Passed: Inspection Pass Rate: 84.21% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 07/09/2010PassTed DyeResidential Footing Inspection 07/13/2010PassTed DyeFoundation Inspection 10/14/2010PassTed DyeResidential Framing/Structure Inspection 10/25/2010PassTed DyeResidential Insulation Inspection Provide Insulation certificate to be mounted on electrical panel.Inspector Comments: 10/26/2010PassCD InternSidewalk Inspection Inspected Harvard side sidewalk. Base had 8" where checked. *Exception 1st south side has not been checked. Inspector Comments: 11/01/2010PassTed DyeResidential Sheetrock/Drywall Inspection 03/05/2012FailQuinton OwensResidential Building Final Garage unconditioned space --> Ducts to be insulated. No gas shutoffs at appliance locations. Condition crawl space/Add vapor Barrier No House #'s Secure Gas line for water heater. Inspector Comments: 03/07/2012PassQuinton OwensResidential Building Final Final Bldg & Mech. completed Special Conditions: No storage allowed in crawl space. upstairs North & South rooms are not leeping rooms. Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 10-00246 111 S Harvard - New SFR 111 S Harvard New Single Family Residence Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am Permit Inspection Summary Electrical 09/21/2010PassBret StoddardResidential Electrical Service Inspection Approved to be energized for permanent power.Inspector Comments: 10/14/2010PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover.Inspector Comments: 03/05/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Receptacle placement not sufficient for the finished space - upstairs liv. rm. Tamper resistant protection required - kitchen recept Disconnect missing - A/C Cover missing - crawl space 2 garg. *No A/C unit installed (40A OCPD). Inspector Comments: 03/07/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final & C.O.Inspector Comments: Mechanical 10/25/2010PassQuinton OwensHVAC Rough-in Mech Rough in Ok *Furnace not installed yet. Inspector Comments: 03/05/2012FailQuinton OwensHVAC Final Inspection Garage unconditioned space --> Ducts to be insulated. No gas shutoffs at appliance locations. Condition crawl space/Add vapor Barrier No House #'s Secure Gas line for water heater. Inspector Comments: 03/07/2012PassQuinton OwensHVAC Final Inspection Final Bldg & Mech. completed Special Conditions: No storage allowed in crawl space. upstairs North & South rooms are not leeping rooms. Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 10-00246 111 S Harvard - New SFR 111 S Harvard New Single Family Residence Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am Permit Inspection Summary Plumbing 07/29/2010PassBrad JohnsonPlumbing Sewer approved to cover sewer line!!Inspector Comments: 09/21/2010PassCD InternPlumbing Water Water Main line, Approved Signed by ? (Jeff ??) Inspector Comments: 10/14/2010PassCD InternPlumbing Rough-in Rough plumbing tested and approved. Approved by ? (Jeff ??) Inspector Comments: 03/05/2012PassDon AllenPlumbing Final Inspection All good for the C/OInspector Comments: Page 3 of 3