HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00246 - 111 S Harvard - New SFRPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am
Permit Details Permit Number: 10-00246
111 S Harvard - New SFR
111 S Harvard
New Single Family Residence
Permit Issued Date:
Permit Inspection Statistics
19Total Inspections Completed:
16Total Inspections Passed:
Inspection Pass Rate: 84.21%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
07/09/2010PassTed DyeResidential Footing Inspection
07/13/2010PassTed DyeFoundation Inspection
10/14/2010PassTed DyeResidential Framing/Structure Inspection
10/25/2010PassTed DyeResidential Insulation Inspection
Provide Insulation certificate to be mounted on electrical panel.Inspector Comments:
10/26/2010PassCD InternSidewalk Inspection
Inspected Harvard side sidewalk. Base had 8" where checked.
*Exception 1st south side has not been checked.
Inspector Comments:
11/01/2010PassTed DyeResidential Sheetrock/Drywall Inspection
03/05/2012FailQuinton OwensResidential Building Final
Garage unconditioned space --> Ducts to be insulated.
No gas shutoffs at appliance locations.
Condition crawl space/Add vapor Barrier
No House #'s
Secure Gas line for water heater.
Inspector Comments:
03/07/2012PassQuinton OwensResidential Building Final
Final Bldg & Mech. completed
Special Conditions: No storage allowed in crawl space. upstairs North & South
rooms are not leeping rooms.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 10-00246
111 S Harvard - New SFR
111 S Harvard
New Single Family Residence
Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am
Permit
Inspection
Summary
Electrical
09/21/2010PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power.Inspector Comments:
10/14/2010PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover.Inspector Comments:
03/05/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Receptacle placement not sufficient for the finished space - upstairs liv. rm.
Tamper resistant protection required - kitchen recept
Disconnect missing - A/C
Cover missing - crawl space 2 garg.
*No A/C unit installed (40A OCPD).
Inspector Comments:
03/07/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final & C.O.Inspector Comments:
Mechanical
10/25/2010PassQuinton OwensHVAC Rough-in
Mech Rough in Ok
*Furnace not installed yet.
Inspector Comments:
03/05/2012FailQuinton OwensHVAC Final Inspection
Garage unconditioned space --> Ducts to be insulated.
No gas shutoffs at appliance locations.
Condition crawl space/Add vapor Barrier
No House #'s
Secure Gas line for water heater.
Inspector Comments:
03/07/2012PassQuinton OwensHVAC Final Inspection
Final Bldg & Mech. completed
Special Conditions: No storage allowed in crawl space. upstairs North & South
rooms are not leeping rooms.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 10-00246
111 S Harvard - New SFR
111 S Harvard
New Single Family Residence
Permit Status of (Open) as of Report Date: 06/16/2020 9:07 am
Permit
Inspection
Summary
Plumbing
07/29/2010PassBrad JohnsonPlumbing Sewer
approved to cover sewer line!!Inspector Comments:
09/21/2010PassCD InternPlumbing Water
Water Main line, Approved
Signed by ? (Jeff ??)
Inspector Comments:
10/14/2010PassCD InternPlumbing Rough-in
Rough plumbing tested and approved.
Approved by ? (Jeff ??)
Inspector Comments:
03/05/2012PassDon AllenPlumbing Final Inspection
All good for the C/OInspector Comments:
Page 3 of 3