Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00253 - Northgate Apartments Bldg #1 - 101-112Permit Inspection Summary Permit Status of (Open) as of Report Date: 06/16/2020 8:58 am Permit Details Permit Number: 10-00253 Northgate Apartments Bldg #1 - 101-112 350 W 6th S New Multi-Family Residence Permit Issued Date: Permit Inspection Statistics 19Total Inspections Completed: 18Total Inspections Passed: Inspection Pass Rate: 94.74% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 07/29/2010PassQuinton OwensCommercial Footing Inspection OK to pour (Removed loose materials from footing Inspector Comments: 07/30/2010PassJohn BerryCommercial Footing Inspection Foundation - South, West, & East OK to poor.Inspector Comments: 08/03/2010PassJohn BerryFoundation Inspection Rebar & Foundation looks goodInspector Comments: 08/17/2010PassJohn BerryCommercial Footing Inspection Interior Footings look good.Inspector Comments: 08/30/2010PassJohn BerryCommercial Framing/Structure Inspection Exterior hold downs & sheathing OK to cover.Inspector Comments: 09/14/2010PassQuinton OwensCommercial Framing/Structure Inspection Seal off around furred out walls behind main floor tub/shower. Soutside OK 9-17. Inspector Comments: 09/16/2010PassQuinton OwensCommercial Insulation Inspection OK to drywallInspector Comments: 09/20/2010PassQuinton OwensCommercial Insulation Inspection Secure studs in party walls. 9/22Inspector Comments: 09/23/2010PassQuinton OwensCommercial Sheetrock/Drywall Inspection Completed 9-27Inspector Comments: 09/24/2010PassQuinton OwensCommercial Sheetrock/Drywall Inspection Drywall OK to tape.Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 10-00253 Northgate Apartments Bldg #1 - 101-112 350 W 6th S New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/16/2020 8:58 am Permit Inspection Summary 11/16/2010FailQuinton OwensCommercial Building Final #101 Drywall patched w/silicone & sheet metal (all units). #107 Handrail too high at lower portion of stairs. 38" max. above front edge of tread. #103 Patch Drywall by sprinkler in bath. #110 Stair Smoke Det. not interconnected. #102 &104 Seal at tub base on main floor. #103 Non rated Drywall patch on ceiling. Inspector Comments: 11/22/2010PassQuinton OwensCommercial Building Final Previous items complied with. Approved with exception: Inspection of fire stop rings in bathrooms. Inspector Comments: Electrical 09/15/2010PassDon AllenCommercial Electrical Rough-in **Approved by Jeff Hackworth** NW unit kitchen West Wall - Offer grd. not attached. (Do not cover) Services not looked at. Walls good to cover. Call back for Service inspection. Inspector Comments: 09/15/2010PassDon AllenCommercial Electrical Rough-in **Approved by Jeff Hackworth**Inspector Comments: 09/16/2010PassBret StoddardCommercial Electrical Rough-in Approved for cover - northside *Services approved to energized (xz) (not doghouse) Inspector Comments: 09/30/2010PassBret StoddardCommercial Electrical Rough-in Approved for Cover - Doghouse only. *Service approved to be energized for permanent power. Inspector Comments: 12/03/2010PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for final DoghouseInspector Comments: Plumbing 08/12/2010PassBrad JohnsonPlumbing Underground Inspection Approved for cover!Inspector Comments: 10/28/2010PassBrad JohnsonPlumbing Final Inspection Approved for plumbing final.Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 10-00253 Northgate Apartments Bldg #1 - 101-112 350 W 6th S New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/16/2020 8:58 am Permit Inspection Summary Page 3 of 3