HomeMy WebLinkAboutCONCRETE TEST 44 - The Grove at Thomson FarmsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Construction 06/09/2020
Cloudy, Frosty
5:30 AM
32
11:30 AM
I arrived on site and observed that the contractor had prepared for the pour by placing a blue moisture
barrier along the length of the pour. The ordered amount of concrete was 140 yards. The contractor poured
120 of which into the slab on grade, and then realized that they had overestimated the necessary quantity
of concrete. They then completed the preparation for the footings on another building and poured the
remaining concrete there. The steel reinforcement in the footings appeared to be in general conformance
with the project documents. The concrete for the slab on grade was of a higher design strength than that of
the footings. I observed that the contractor was in general conformance to project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.10 07:25:32
-06'00'8129697
Preparation for slab on grade concrete Preparation for slab on grade concrete Preparation for Footing concrete
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Preparation for Footing concrete Preparation for Footing concrete